Date Inspected | Location in School | Health & Safety Issue Observed | Class | Action Taken By | Date Action Taken | Details |
09/05/17 | 123 bioler room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 09/29/17 | Details |
09/05/17 | hallway | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 09/29/17 | Details |
09/05/17 | 121 | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 09/29/17 | Details |
09/05/17 | 123 bioler room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 09/29/17 | Details |
09/05/17 | 123 bioler room | housekeeping, clutter, dust or dirt | B | John Polanyi - Bathurst Heights | 09/29/17 | Details |
09/05/17 | 231c fan room | leaking/pooling/ponding of water or liquid (be as specific as possible) | A | John Polanyi - Bathurst Heights | 09/29/17 | Details |
09/05/17 | 131 | door not opening or closing properly (interior or exterior) | A | John Polanyi - Bathurst Heights | 09/29/17 | Details |
11/03/17 | 200a | eyewash station required or in need of repair (specify) | A | John Polanyi - Bathurst Heights | 11/03/17 | Details |
11/03/17 | Gym 101 | receptacle/light switch (specify) | A | John Polanyi - Bathurst Heights | 11/03/17 | Details |
11/03/17 | Boiler Room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 11/03/17 | Details |
12/27/17 | boiler room 114e | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 02/28/18 | Details |
12/27/17 | Pool Mech Room | trip hazard (i.e. flooring, wiring, other materials) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
01/09/18 | Stairwell | lighting in need of repair | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 306 | leaking/pooling/ponding of liquid (specify liquid and source if possible) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 305 | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 304 | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 302 | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 301 | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | Hallway | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 300 | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | Stairwell | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 302 | window covering damaged/in need of repair | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | Mech. room - above stage left | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 02/28/18 | Details |
01/09/18 | 123 Boiler Room | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 02/28/18 | Details |
01/09/18 | Mech. room - in 232 | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 02/28/18 | Details |
01/09/18 | 114 Boiler Room | guarding or shielding not in place | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
01/09/18 | 304 | trip hazard (i.e. flooring, wiring, other materials) | A | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 306 | equipment damaged or not secured | B | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 303 | equipment damaged or not secured | B | John Polanyi - Bathurst Heights | 04/04/18 | Details |
01/09/18 | 114 Boiler Room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 04/04/18 | Details |
02/01/18 | Hallway | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 229 | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 212 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 220 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 222 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 230 | fire exit route sign (yellow TDSB) - not posted / requires updating | B | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 224 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 223 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 225 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 227 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
02/01/18 | 228 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 02/28/18 | Details |
02/01/18 | 226 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 03/01/18 | Details |
03/02/18 | 114 Boiler Room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 04/04/18 | Details |
04/23/18 | 114 Boiler Room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 08/27/18 | Details |
06/04/18 | 132 | equipment damaged or not secured | B | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | S-7b | equipment damaged or not secured | B | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | S-3 | equipment damaged or not secured | B | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | S-7 | inspections not up to date (specify equipment) | B | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Mech. room - above stage left | guarding or shielding not in place | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | 123A Pool Tunnel Access Room | guarding or shielding not in place | A | John Polanyi - Bathurst Heights | 09/03/18 | Details |
06/04/18 | Mech. room - in S3, above S1 | guarding or shielding not in place | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Mech. room - above stair 7 | guarding or shielding not in place | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Mech. room - above stage left | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | 123 Boiler Room | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Mech. room - above stair 7 | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Mech. room - in 232 | extinguisher - tag missing or annual inspection more than 3 months overdue | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Hallway | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 115H | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 115G | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 116A | ceiling tiles missing | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | Hallway | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 107B | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 108 | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | Slop sink | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | Hallway | ceiling damaged (specify) | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 108B | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | John Polanyi - Bathurst Heights | 09/23/18 | Details |
06/04/18 | 132 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | 107 | ventilation (specify) | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | 108 | PPE - personal protective equipment not available | B | John Polanyi - Bathurst Heights | 11/02/18 | Details |
06/04/18 | 120 | PPE - personal protective equipment not available | B | John Polanyi - Bathurst Heights | 11/02/18 | Details |
06/04/18 | 135 | PPE - personal protective equipment not available | B | John Polanyi - Bathurst Heights | 11/02/18 | Details |
06/04/18 | S-7 | fire extinguisher not adequately charged or mounted | A | John Polanyi - Bathurst Heights | 09/04/18 | Details |
06/04/18 | Boiler Room | ACM - yellow asbestos bags present (incl. number of bags) | A1 | John Polanyi - Bathurst Heights | 09/03/18 | Details |
06/04/18 | 118A | equipment damaged or not secured | B | John Polanyi - Bathurst Heights | 09/04/18 | Details |