| Brief Description | Priority |
| Auxiliary Equipment - Condensate Return Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps - 1971 Renewal | Urgent |
| Auxiliary Equipment - Heat Exchangers - Shell & Tube Renewal | Urgent |
| Heating/Glycol Distribution Systems - Piping Systems Renewal | Urgent |
| Roof Coverings - Section A,B3,B8,B9,C,F Renewal | Urgent |
| Roof Openings - Skylight - Older Renewal | Urgent |
| Site Civil/Mechanical Utilities Renewal | Urgent |
| Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct Systems Renewal | High |
| Air Handling Units - Central Station AHUs - AHU #6 thru #9 Renewal | High |
| Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103010 Fittings - Millwork - Laboratories Renewal | High |
| C103017 Fittings - Auditorium Seating Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Acoustic Ceiling Tiles Renewal | High |
| Ceiling Finishes - Plaster & Drywall Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panels Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - Split DX - Courtyard Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Metal Doors Renewal | High |
| Exterior Walls - Joint Sealant Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Exterior Windows - Original Windows Renewal | High |
| Fencing & Gates - Fencing Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Gymnasium Bleachers Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Lighting Equipment - Exterior Renewal | High |
| Parking Lots - Paved Renewal | High |
| Pedestrian Paving - Paved Renewal | High |
| Playing Fields - Gravel Running Track Renewal | High |
| Playing Fields - Sportsfield - Unpaved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Rain Water Drainage - Sump Pumps Renewal | High |
| Retaining Walls Renewal | High |
| Roof Top AHU - Cool - RTU #8 Renewal | High |
| Roof Top AHU - Heat & Cool - RTU #6 Renewal | High |
| Roof Top AHU - Heat - RTU #11 and RTU #5 Renewal | High |
| Sanitary Waste - Piping Renewal | High |
| Signage Renewal | High |
| Stormwater Management Renewal | High |
| Wall Finishes - Acoustic Wall Tiles Renewal | High |
| Wall Finishes - Painted Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | Medium |
| Cooling Generating Systems - Condenser #4 Renewal | Medium |
| Exterior Doors - Overhead and Roll - up Renewal | Medium |
| Interior Doors - Hardware Renewal | Medium |
| Interior Doors - Metal Renewal | Medium |
| Interior Stair Construction Renewal | Medium |
| Make - Up AHU - Shops Renewal | Medium |
| Roof Coverings - Section B6 Renewal | Medium |
| Roof Top AHU - Cool - RTU #9 Renewal | Medium |
| Roof Top AHU - Heat & Cool - RTU #2 and RTU #7 Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Fittings - Salon Chairs Renewal | Low |
| Fittings - Vertical Blinds Renewal | Low |