| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
| Auxiliary Equipment - Condensate and Vacuum Return Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps - Original Renewal | Urgent |
| B2020 Exterior Windows - Older Wood Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Elevators and Lifts - Passenger - Hydraulic Renewal | Urgent |
| Exterior Windows - North Addition Renewal | Urgent |
| Heated Water Distribution System - Pipes and Fittings - Level 1 and 2 Renewal | Urgent |
| Heated Water Distribution System - Pipes and Fittings - Level 3 and 4 Renewal | Urgent |
| Roof Coverings - Section C2,C3,D Renewal | Urgent |
| Roof Coverings - Section C,C1,C4 Renewal | Urgent |
| Roof Coverings - Section CF Renewal | Urgent |
| Roof Coverings - Skylights Renewal | Urgent |
| Air Handling Units - AHU #4 Thru #10 Renewal | High |
| B201014 Exterior Walls - Masonry Re-pointing - Localized Deficiencies Renewal | High |
| B203008 Exterior Doors - Hardware - Older Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C103017 Fittings - Auditorium Seating Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Original Building Renewal | High |
| Chilled Water Systems - SF Chiller - Music Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - DX Split - CU #1 and #2 Renewal | High |
| Domestic Water Distribution - Other Supply - Swimming Pool & Systems Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Water Treatment Systems Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Doors - Original Building Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating - Level 1 and 2 Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating - Level 3 and 4 Renewal | High |
| Fittings - Metal Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Ceramic Tile Renewal | High |
| Floor Finishes- Sheet Floor Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Pedestrian Paving Renewal | High |
| Playing Fields - Paved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Washroom Renewal | High |
| Retaining Walls - Flag Stone Renewal | High |
| Sanitary Waste Renewal | High |
| Wall Finishes - Painted - Classrooms Renewal | High |
| Wall Finishes - Painted - Common Areas Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | Medium |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System - Level 1 and 2 Renewal | Medium |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System - Level 3 and 4 Renewal | Medium |
| Distribution Systems - Exhaust Systems - Fume Hoods Renewal | Medium |
| Interior Doors Renewal | Medium |
| Interior Doors hardware - Original Building Renewal | Medium |
| Interior Stair Construction - Original Building Renewal | Medium |
| Landscaping - North Edged Renewal | Medium |
| Roof Coverings - Section F1 Renewal | Medium |
| Wall Finishes - Ceramic Tile Renewal | Medium |
| ~D202033 Domestic Water Distribution - Pumps Renewal | Low |