| Brief Description | Priority |
| Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
| Exterior Windows - Older Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Auxiliary Equipment - Expansion Tanks Renewal | High |
| Auxiliary Equipment - HVAC Pumps Renewal | High |
| Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Ceiling - Original Building and Additions 1 & 2 Renewal | High |
| Controls and Instrumentation - Electronic/BAS Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Natural Gas DWH #2 Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Hollow Metal - Older Renewal | High |
| Fin Tube Radiation Units - Original Perimeter Heating Renewal | High |
| Fittings - Millwork - Original Building and Additions 1 & 2 - Older Renewal | High |
| Floor Finishes - Carpet - Original Building and Additions 1, 2 & 3 Renewal | High |
| Floor Finishes - Hardwood - Gym 1, Stage Renewal | High |
| Floor Finishes - Hardwood - Gyms 2 & 3, Stage Renewal | High |
| Floor Finishes - Terrazzo - Halls and Washrooms Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Interior Doors - Hardware - Older Renewal | High |
| Interior Doors - Original Building and Additions 1 & 2 - Older Renewal | High |
| Lighting Equipment - Exterior - Wall Mounted Renewal | High |
| Playing Fields - Grass Covered Playground - Unpaved Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Roof Coverings - Section A,B,B1,C,C4,D,G,G1,G2,H,I Renewal | High |
| Sanitary Waste - New Renewal | High |
| Signage Renewal | High |
| Wall Finishes - Painted Renewal | High |
| Air Distribution, Heating & Cooling - Duct System Renewal | Medium |
| Auxiliary Equipment - Heat Exchanger - Plate Renewal | Medium |
| Auxiliary Equipment - Humidifiers Renewal | Medium |
| Auxiliary Equipment - Stacks & Breaching Renewal | Medium |
| Chilled Water Systems - Air-Cooled Chiller Renewal | Medium |
| Cooling Generating Systems - Self-Contained AHU - RM 208 Renewal | Medium |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | Medium |
| Domestic Water Distribution - Eyewash Stations Renewal | Medium |
| Domestic Water Distribution - Natural Gas DWH #1 Renewal | Medium |
| Elevators and Lifts - Wheelchair Lift Renewal | Medium |
| Exit Lighting and Signs Renewal | Medium |
| Fencing & Gates - Chain Link Fencing Renewal | Medium |
| Fittings - Millwork - Addition Renewal | Medium |
| Floor Finishes - Painted/Sealed Concrete - Mechanical (3), Garbage Renewal | Medium |
| Floor Finishes - Vinyl Tile - Addition Renewal | Medium |
| Floor Finishes - Vinyl Tile - Rooms 101,102,208,209 Renewal | Medium |
| Hot Water Boilers - Boiler #1 & #3 Renewal | Medium |
| Interior Stair Construction - Original Renewal | Medium |
| Lighting Equipment - Exterior - Pole Renewal | Medium |
| Lighting Equipment - Interior Lighting Renewal | Medium |
| Parking Lots Renewal | Medium |
| Pedestrian Paving - Concrete Paved Walkways Renewal | Medium |
| Playing Fields - Paved Renewal | Medium |
| Roof Top AHU - RTU #1 Renewal | Medium |
| Roof Top AHU - RTU #2 Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Ceiling Finishes - Painted Ceiling Structures - Gym 1 Renewal | Low |
| Ceiling Finishes - Painted Lightweight Concrete Renewal | Low |
| Ceiling Finishes - Suspended Acoustic Panel Ceiling Renewal | Low |
| Controls & Instrumentation - EMS Renewal | Low |
| Fittings - Addition Renewal | Low |
| Fittings - Original - Chalkboards, Tackboards Renewal | Low |
| Fittings - Window Coverings - All - Sunscreen and Vinyl Roller Blinds Renewal | Low |
| Interior Doors - Hardware - Addition Renewal | Low |
| Playing Fields - No Playscapes Exist - Unpaved Renewal | Low |
| Wall Finishes - Acoustic Wall Treatment - Gym, Music Room Renewal | Low |
| Wall Finishes - Ceramic Tile - Addition Renewal | Low |
| Wall Finishes - Concrete Block - Painted Renewal | Low |