| Brief Description | Priority |
| Auxiliary Equipment - Circulation Pumps and Condensate Return Pumps Renewal | Urgent |
| Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
| Electrical Service and Distribution - MCC and DP Renewal | Urgent |
| Exterior Windows - Original Renewal | Urgent |
| Site Civil Utilities - Underground Utilities Renewal | Urgent |
| Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Air Distribution, Heating & Cooling - Ductwork Renewal | High |
| Auxiliary Equipment - Expansion Tank - Hot Water Heating Loop Renewal | High |
| Branch Wiring - 1950 Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C302002 Floor Finishes - Terrazzo - Epoxy Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Fixed Acoustic Tile - Original Building Renewal | High |
| Controls and Instrumentation - BAS Renewal | High |
| Cooling Generating Systems - Window AC Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Water Storage Tank Renewal | High |
| Exterior Doors - Hardware - Older Renewal | High |
| Exterior Doors - Older Renewal | High |
| Exterior Walls - Joint Sealant Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing & Gates - Chain Link - Site Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork - 1927 & 1960 Building Renewal | High |
| Floor Finishes - Hardwood - Gymnasium Renewal | High |
| Floor Finishes - Painted Concrete - Mechanical Room Renewal | High |
| Interior Doors - 1927 & 1960 Buildings - Wood and Metal Renewal | High |
| Interior Doors - Hardware - 1927 & 1960 Buildings Renewal | High |
| Lighting Equipment - Exterior - Pole Renewal | High |
| Lighting Equipment - Exterior - Wall Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Roadways - Asphalt - Site Renewal | High |
| Roof Top AHU - Cool - RTU #3 Renewal | High |
| Sanitary Waste - Piping Renewal | High |
| Wall Finishes - Painted Renewal | High |
| Air Handling Units - SF#1, #2, #3 Renewal | Medium |
| Auxiliary Equipment - Blowdown and Condensate Renewal | Medium |
| Auxiliary Equipment - Chemical Feed Systems Renewal | Medium |
| Ceiling Finishes - Suspended Ceiling Tiles Renewal | Medium |
| Cooling Generating Systems - DX Split AHU - Cool - CU #3 and #4 Renewal | Medium |
| Cooling Generating Systems - DX Split AHU - Cool Renewal | Medium |
| Exterior Doors - 1990 Building - Hollow Metal Renewal | Medium |
| Floor Finishes - Terrazzo, Ceramic Renewal | Medium |
| Heat Generating - Hot Water Boilers - #2 and #3 Renewal | Medium |
| Heat Generating - Steam Boilers - #4 and #5 Renewal | Medium |
| Hot Water Boilers - DHW Boiler #1 Renewal | Medium |
| Interior Stair Construction - Original Building Renewal | Medium |
| Pedestrian Paving - Concrete & Asphalt - Site - Paved Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Exterior Doors - Automatic Device Renewal | Low |
| Exterior Doors - Hardware - 1990 Building Renewal | Low |
| Interior Doors - 1990 Building Renewal | Low |
| Interior Doors - Hardware - 1990 Building Renewal | Low |
| Interior Stair Construction - Interior Ramps Renewal | Low |
| Other Special Systems and Devices - Dust Collector Renewal | Low |