| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| Exterior Windows - Single glazed windows Renewal | Urgent |
| Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
| Air Handling Units - SF #1, #2 and #3 Renewal | High |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C102007 Interior Doors - Hardware Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C2020 Stair Finishes - Anti-skid tape Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Acoustic Tiles - 1963 construction Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - Window AC Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Electrical Service and Distribution - Panelboards Renewal | High |
| Energy Supply System - Natural Gas Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Ceramic Tile Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Floor Finishes - Library Carpet Renewal | High |
| G204002 Retaining Walls - Rail Ties Renewal | High |
| Interior Doors - Wooden Classroom & Metal Hallway Doors Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Main Switchboards - Switchgear Renewal | High |
| Parking Lots - Asphalt - North & West Renewal | High |
| Pedestrian Paving - Concrete and asphalt walkways Renewal | High |
| Playing Fields - Asphalt Playground Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Roadways - Paved Roadway Renewal | High |
| Sanitary Waste Renewal | High |
| Auxiliary Equipment - Chemical Feed Systems Renewal | Medium |
| Auxiliary Equipment - HVAC Pumps Renewal | Medium |
| B308020 Exterior Soffits Renewal | Medium |
| Ceiling Finishes - Acoustic Tile 2'X4' - Suspended Tiles Renewal | Medium |
| Controls and Instrumentation - BAS Renewal | Medium |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | Medium |
| Domestic Water Distribution - DHW Circ. and Sump Pumps Renewal | Medium |
| Domestic Water Distribution - DHWH #1 and #2 Renewal | Medium |
| Exterior Doors - Two replaced metal Renewal | Medium |
| Fittings - One retractable stage in 1963 construction Renewal | Medium |
| Heating Water Distribution Systems - Pipes and Fittings Renewal | Medium |
| Rain Water Drainage Renewal | Medium |
| Signage - One wall mounted sign Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Stormwater Management Renewal | Medium |
| Wall Finishes - Ceramic Tile Renewal | Medium |
| Wall Finishes - Painted - 1963 & 1971 constructions Renewal | Medium |
| Interior Stair Construction - Four stairs in 1963 & 1971 constructions Renewal | Low |
| Landscaping - Decorative trees Renewal | Low |
| Pedestrian Paving - Two chain and post arrangements Renewal | Low |