| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| Energy Supply System - Natural Gas - Piping Renewal | Urgent |
| Exterior Windows - Older Renewal | Urgent |
| Heating Water Distribution Systems - Heating Piping System Renewal | Urgent |
| Hot Water Boilers - B #1 and B #2 Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Roof Coverings - Drainage Renewal | Urgent |
| Site Civil/Mechanical Utilities Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Structural Frame - Localized Deficiencies Renewal | Urgent |
| Air Distribution, Heating & Cooling - Ductwork Renewal | High |
| Air Handling Units - SF #1 Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Ceilings - Original Building, Addition 1, 2, & 3 Renewal | High |
| Controls & Instrumentation - EMS Renewal | High |
| Cooling Generating Systems - Window A/C Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Natural Gas DWHs Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Sump and Domestic Hot Water Pumps Renewal | High |
| Exhaust Systems Renewal | High |
| Exterior Doors - Hardware - 1958 to 1968 Renewal | High |
| Exterior Doors - Hollow Metal and Wood - 1958 to 1968 Renewal | High |
| Exterior Lighting - Wall Mounted Renewal | High |
| Exterior Walls - Cement wall board Renewal | High |
| Exterior Walls - Joint Sealant Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing & Gates - Chain-Link Fencing Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork - Original Building, Addition 1, 2, & 3 Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Interior Doors - Metal and Wood Doors - Original & Addition 1, 2, & 3 Renewal | High |
| Lighting Equipment - Interior Lighting Renewal | High |
| Parking Lots - Asphalt Paved Parking Lot Renewal | High |
| Playing Fields - Asphalt Paved Schoolyard - East Building Renewal | High |
| Playing Fields - Grass Surfaced - Unpaved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Roadways - Asphalt Paved Roadway Renewal | High |
| Sanitary Waste Renewal | High |
| Stormwater Management Renewal | High |
| Wall Finishes - Painted - Original Building, Addition 1, 2, & 3 Renewal | High |
| Controls and Instrumentation - BAS Renewal | Medium |
| Emergency Lighting and Power - Inverter Renewal | Medium |
| Interior Doors - Hardware - Original Building, Addition 1, Addition 2 and Addition 3 Renewal | Medium |
| Interior Stair Construction - Original Building Renewal | Medium |
| Pedestrian Paving - Asphalt & Concrete Walkways Renewal | Medium |