| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Energy Supply System - Natural Gas - Piping Renewal | Urgent |
| Exterior Windows - Single Glazed Units Renewal | Urgent |
| Heating Water Distribution Systems - Heating Piping System Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Secondary Transformers Renewal | Urgent |
| Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Air Distribution, Heating & Cooling - Ductwork Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
| C1010 Partitions - Localized deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Classrooms Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Ceilings Renewal | High |
| Cooling Generating Systems - AC #1 Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Natural Gas DWH Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Sump Pumps Renewal | High |
| Exhaust Systems - Internal Renewal | High |
| Exhaust Systems - WR Renewal | High |
| Exterior Doors - Hardware - Entire School Renewal | High |
| Exterior Doors - Hollow Metal Doors Renewal | High |
| Exterior Lighting - Wall Mounted Renewal | High |
| Exterior Walls - Joint Sealant Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing & Gates - Chain Link Fence Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork - Laboratories Renewal | High |
| Fittings - Student Storage Lockers Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Floor Finishes - Vinyl Tiles - Entire School Renewal | High |
| Interior Doors - Hardware - Entire School Renewal | High |
| Interior Doors - Older Renewal | High |
| Parking Lots - Asphalt Paved Parking Lot Renewal | High |
| Pedestrian Paving - Asphalt Paved Walkways Renewal | High |
| Playing Fields - Grass Surfaced - Unpaved Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Roof Top AHU - Cool - RTU #2 Renewal | High |
| Roof Top AHU - Heat & Cool - RTU #1 Renewal | High |
| Sanitary Waste Renewal | High |
| Stormwater Management Renewal | High |
| Wall Finishes - Ceramic Wall Tile Renewal | High |
| Wall Finishes - Painted - Entire School Renewal | High |
| Controls & Instrumentation - BAS Renewal | Medium |
| Cooling Generating Systems - AC #2 Renewal | Medium |
| Domestic Water Distribution - Eyewash Stations Renewal | Medium |
| Exit Lighting and Signs Renewal | Medium |
| Exterior Soffits Renewal | Medium |
| Interior Stair Construction - Original Building Renewal | Medium |
| Plumbing Fixtures - Urinals Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Playing Fields - Henderson Playscape - Unpaved Renewal | Low |
| Roadways - Pick-up & Drop-off Driveway Renewal | Low |