Toronto District School Board
Skip to main content

Rosethorn Junior School (GR. JK-05)

Health and Safety (H&S) workplace inspections are conducted every month in all of our 582 operating schools. Below you can find the H&S reports for your school, for the 2019-2020 and 2020-2021 school years.  More information and Frequently Asked Questions

Date InspectedLocation in SchoolHealth & Safety Issue ObservedClassAction Taken ByDate Action TakenDetails
09/28/19Boiler Rm ACM - yellow asbestos bags present (incl. number of bags)A1Principal11/01/19Details
09/28/19Boiler Roomemergency lighting damaged/missing APrincipal11/01/19Details
09/28/19Boiler Roomemergency lighting damaged/missing APrincipal11/01/19Details
09/28/19Boiler Roomstorage - inappropriate storage of materials (ie. furniture, boxes )BPrincipal12/02/19Details
09/28/19General Purpose Roominappropriate storage of materials/furniture/shelving, or clutterBPrincipal11/01/19Details
09/28/19Boiler Roominappropriate storage of materials/furniture/shelving, or clutterBPrincipal12/02/19Details
09/28/19Boiler Rm storage - inappropriate storage of materials (ie. furniture, boxes )BPrincipal12/02/19Details
09/28/19Boiler Rm leaking/pooling/ponding of water or liquid (be as specific as possible)APrincipal11/01/19Details
10/31/1912ACM - tiles broken/damaged, possible ACMAPrincipal11/01/19Details
10/31/19M-1 Boiler RoomACM - yellow asbestos bags present (incl. number of bags)A1Principal11/01/19Details
10/31/19Boiler Rm ACM - yellow asbestos bags present (incl. number of bags)A1Principal11/01/19Details
10/31/1910window covering damaged/in need of repairAPrincipal11/01/19Details
10/31/19Boiler RoomACM - yellow asbestos bags present (incl. number of bags)A1Principal11/01/19Details
11/28/19Hallwaydisplay(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal12/02/19Details
11/28/191Bdisplay(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal12/02/19Details
11/28/19Hallwayegress blocked or insufficient path (doorway, hallway or stairwell)BPrincipal12/02/19Details
11/28/19Hallwayequipment damaged or not securedBPrincipal12/02/19Details
11/28/19Stagedoor/access door (specify)APrincipal12/02/19Details
11/28/19Hallwayegress blocked or insufficient path (doorway, hallway or stairwell)BPrincipal12/02/19Details
11/28/191Aventilation (specify)APrincipal12/02/19Details
01/24/207trip hazard (i.e. flooring, other materials)ACaretaker04/01/20Details
01/24/208inappropriate storage of materials/furniture/shelving, or clutterBPrincipal03/04/20Details
01/24/207inappropriate storage of materials/furniture/shelving, or clutterBPrincipal03/04/20Details
02/28/203ceiling tiles missingACaretaker04/01/20Details
09/10/2014air - return/supply (specify)ACaretaker09/24/20Details
09/10/2013air - return/supply (specify)ACaretaker09/24/20Details
09/10/20Office - Mainreceptacle/light switch (specify)APrincipal03/01/21Details
09/10/20Office - Mainair - return/supply (specify)ACaretaker09/24/20Details
10/15/20generalStaff/student observed drinking directly from a drinking fountainBPrincipal03/01/21Details
11/18/20Stagedoor/access door (specify)ACaretaker03/01/21Details
12/18/20C-1Staff/student observed drinking directly from a drinking fountainBPrincipal03/01/21Details
12/18/20Boiler Roomexhaust - exhaust required repairAPrincipal03/01/21Details
12/18/20Boiler Roomventilation (specify)APrincipal03/01/21Details
01/29/21Hallwayfire separating doors in hallways/corridors being propped open (not classroom doors)BCaretaker02/10/21Details
01/29/21school widedisplay(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal03/01/21Details
01/29/216air - return/supply (specify)ACaretaker02/10/21Details
01/29/214air - return/supply (specify)ACaretaker02/10/21Details
01/29/215air - return/supply (specify)ACaretaker02/10/21Details
01/29/213air - return/supply (specify)ACaretaker02/10/21Details
01/29/21school wideair - return/supply (specify)ACaretaker03/01/21Details
03/05/2114inappropriate storage of materials/furniture/shelving, or clutterBCaretaker05/31/21Details
05/31/21Boiler Roomleaking/pooling/ponding of water or liquid (be as specific as possible)ACaretaker05/31/21Details
05/31/21Staff Roomlighting in need of repair (maintenance issue)ACaretaker06/25/21Details
05/31/21Office - Mainceiling damaged (specify)ACaretaker06/18/21Details
© 2014 Toronto District School Board  |  Terms of Use  |  Privacy   |  CASL