| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Auxiliary Equipment - Heat Exchanger #1 Renewal | Urgent |
| B2030 Exterior Doors - Hollow Metal & Wood Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Exterior Windows - Sun Room Renewal | Urgent |
| Floor Finishes - Carpet Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Auxiliary Equipment - Vacuum Return Renewal | High |
| B201014 Exterior Walls - Masonry Re-pointing - 1935 Renewal | High |
| B203008 Exterior Doors - Hardware Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C103017 Fittings - Auditorium Seating - Older Balcony Renewal | High |
| C302015 Floor Finishes - Vinyl Sheet Renewal | High |
| Controls and Instrumentation - BAS Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Domestic Water Distribution - Domestic Hot Water Storage Tank - Building Renewal | High |
| Domestic Water Distribution - Hot Water Storage Tank - Pool Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Elevators and Lifts - Wheelchair Lifts Renewal | High |
| Exhaust Systems - Axial Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Walls - 1953 Construction Renewal | High |
| Fencing & Gates - Chain Link Fence Renewal | High |
| Fittings - Bleachers Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Ceramic Tile Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Floor Finishes - Terrazzo Renewal | High |
| Floor Finishes - Vinyl Floor Tiles Renewal | High |
| G204001 Fencing and Gates - Wrought Iron Fencing Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs & Bleachers Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Partitions - Localized defeciencies Renewal | High |
| Playing Fields - Soccer/football field Renewal | High |
| Plumbing Fixtures - Washroom Renewal | High |
| Roadways Renewal | High |
| Sanitary Waste Renewal | High |
| Signage Renewal | High |
| Stair Construction - Localized deficiencies Renewal | High |
| Stormwater Management Renewal | High |
| Wall Finishes - Paint Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | Medium |
| Ceiling Finishes - Lathe & Plater Ceiling Renewal | Medium |
| Ceiling Finishes - Suspended Ceiling Tile Renewal | Medium |
| Cooling Generating Systems - DX Split - CU #5 Renewal | Medium |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | Medium |
| Domestic Water Distribution - DHWH #2 and #3 Renewal | Medium |
| G203003 Pedestrian Paving - Concrete Paved Walkway Renewal | Medium |
| Interior Doors Renewal | Medium |
| Landscaping - Unpaved sodded lawns Renewal | Medium |
| Lighting and Branch Wiring - Stage Lighting Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |