| Brief Description | Priority |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Exterior Windows - Aluminum - North Renewal | Urgent |
| Roof Coverings - Section A,B,B4 Renewal | Urgent |
| Roof Coverings - Section A1,AB1,B1 Renewal | Urgent |
| Roof Coverings - Section B2,B3,C,D9 to D16,E to E3,F Renewal | Urgent |
| Roof Coverings - skylights and coping Renewal | Urgent |
| Air Handling Units - AHU and RF No. 2 and 3 Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
| C303002 Ceiling Finishes - Plaster - Older Renewal | High |
| Ceiling Finishes - Acoustic Tile Ceiling - Corridors & 70% Classrooms Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Ceiling - 30% Classrooms & Corridors Renewal | High |
| Controls and Instrumentation - BAS Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors -Wood Renewal | High |
| Exterior Walls - Columns Renewal | High |
| Exterior Walls - Sealants Renewal | High |
| Fencing & Gates - Perimeter Fence etc. Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Hardwood - Classrooms Renewal | High |
| Floor Finishes - Hardwood - Gymnasiums and Stage Renewal | High |
| Floor Finishes - Painted/Sealed Concrete Floor - Basement Renewal | High |
| Floor Finishes - Sheet Vinyl Floor Renewal | High |
| Interior Doors - Wood Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Parking Lots - Paved Renewal | High |
| Pedestrian Paving - Asphalt Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Rain Water Drainage Renewal | High |
| Roof Top AHU - Heat & Cool - RTU Library Renewal | High |
| Sanitary Waste Renewal | High |
| Steam Heating Distribution Systems - Piping System - 2nd and 3rd Floor Renewal | High |
| Steam Heating Distribution Systems - Piping System - Boiler Room and First Floor Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Painted Renewal | High |
| Air Distribution, Heating & Cooling - Ductwork Renewal | Medium |
| C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
| Cooling Generating Systems - DX Split Renewal | Medium |
| Domestic Water Distribution - DHWH #1 Renewal | Medium |
| Domestic Water Distribution - Sump Pumps Renewal | Medium |
| Emergency Lighting & Power - Inverter Renewal | Medium |
| Energy Supply System - Natural Gas Renewal | Medium |
| Fencing & Gates Renewal | Medium |
| Floor Finishes - Ceramic Tile - Showers Renewal | Medium |
| Interior Doors - Hardware Renewal | Medium |
| Signage Renewal | Medium |
| Wall Finishes - Ceramic Tile - Washrooms, Showers, Classroom Renewal | Medium |
| Ceiling Finishes - Gypsum Board Ceiling - Addition Corridor & Washrooms Renewal | Low |
| Ceiling Finishes - Wood Ceiling - Stage Renewal | Low |
| Fittings - Chalkboards Renewal | Low |
| Landscaping - Soft Renewal | Low |
| Playing Fields - Playscapes - Unpaved Renewal | Low |
| Roadways - South side Renewal | Low |
| Wall Finishes - Major Painting and Wall Upgrades [LEEP] Renewal | Low |
| Wall Finishes - Wood Paneled - Library Renewal | Low |