Brief Description | Priority |
Auxiliary Equipment - Condensate, Vacuum Return and Blowdown Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Distribution Systems - Steam Distribution Systems - Piping System Renewal | Urgent |
Main Switchboards - Switchgear Renewal | Urgent |
Roof Coverings - Section A,A1,B Renewal | Urgent |
Secondary - Transformers Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Unit Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
C1010 Partitions Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103013 Fittings - Retractable Stage (Raised Access Floor) Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Tile Ceiling - Original Building and Additions 1, 2 & 3 Renewal | High |
Ceiling Finishes - Painted Plaster Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - DX Split - Condensers Renewal | High |
Domestic Water Distribution - Natural Gas DWH Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Exhaust Systems Renewal | High |
Exterior Doors - Hardware - Original Building and Additions 1, 2 & 3 Renewal | High |
Exterior Doors - Original Building and Additions 1, 2 & 3 Renewal | High |
Exterior Doors - Overhead and Roll Renewal | High |
Exterior Walls - Joint Sealant Renewal | High |
Exterior Walls - Masonry Re-pointing Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork - Cupboards, Counter Tops Renewal | High |
Floor Finishes - Carpet Flooring - Original Building and Additions 1, 2 & 3 Renewal | High |
Floor Finishes - Hardwood - Classrooms Renewal | High |
Floor Finishes - Terrazzo - Hallways Renewal | High |
Interior Doors - Hardware - Original Building and Additions 1, 2 & 3 Renewal | High |
Interior Doors - Original Wood Doors Renewal | High |
Lighting Equipment - Exterior - Wall Mounted Renewal | High |
Playing Fields - Asphalt Paved - Site Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Sanitary Waste - Piping Renewal | High |
Site Development - Other - Wood Decks On Roof D Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted - Original Building and Additions 1, 2 & 3 Renewal | High |
Interior Stair Construction - Original Building and Additions 1, 2 & 3 Renewal | Medium |
Playing Fields - Playstructure - Unpaved Renewal | Medium |
Playing Fields - Playstructure - Unpaved Renewal | Medium |
Rain Water Drainage Renewal | Medium |
Fittings - Drapes Renewal | Low |
Playing Fields - Mulch - Unpaved Renewal | Low |
Plumbing Fixtures - Urinals Renewal | Low |
Retaining Walls - Brick - Site Renewal | Low |