| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Damp proofing Repair Renewal | Urgent |
| A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Auxiliary Equipment - Condensate, Blow Down and Vacuum Return Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Heat Exchanger - Plate - Glycol Preheat Renewal | Urgent |
| Auxiliary Equipment - Heat Exchanger - Shell & Tube - DHW Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| Distribution Systems - Hydronic/Steam Distribution Systems - Piping System Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Site Civil/Mechanical Utilities Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct System - SF #3 and #4 Renewal | High |
| Air Handling Units - SF #3 and SF #4 Renewal | High |
| Auxiliary Equipment - Chemical Feed Systems Renewal | High |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| Branch Wiring Renewal | High |
| C1010 Partitions - Localized deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302001 Floor Finishes - Ceramic Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Acoustic Tile Ceiling Renewal | High |
| Controls and Instrumentation - BAS Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Hot Water Storage Tank Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Sumps & DHW Circulating Pumps Renewal | High |
| Exterior Doors - Hardware - Older Renewal | High |
| Exterior Doors - Older Renewal | High |
| Fencing & Gates - Chain Link Fence Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes -Terrazzo Renewal | High |
| G204002 Retaining Walls - Stone Renewal | High |
| Gypsum Wallboard Ceiling Finishes Renewal | High |
| Interior Doors - Hardware - Original Building & Additions Renewal | High |
| Interior Doors - Original Building & Additions Renewal | High |
| Lighting Equipment - Exterior - Wall Renewal | High |
| Parking Lots - North Asphalt Pavement Renewal | High |
| Pedestrian Paving Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Roadways Renewal | High |
| Sanitary Waste - Piping Renewal | High |
| Second Floor Washroom Renewal | High |
| Signage Renewal | High |
| Stormwater Management Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Floor Finishes - Carpet - Part of Office & Library Renewal | Medium |
| Interior Stair Construction - Addition Renewal | Medium |
| Interior Stair Construction - Original Building Renewal | Medium |
| Other Electrical - Emergency Lighting and Power - Inverter Renewal | Medium |
| Playing Fields - Asphalt Pavement - Paved Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Fittings - Drapes Renewal | Low |