Church Street Junior Public School

Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
44.03 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion and Blowdown Tanks RenewalUrgent
Auxiliary Equipment - HVAC Return Vac Pump RenewalUrgent
Auxiliary Equipment - Humidifier RenewalUrgent
Distribution Systems - Steam Distribution Systems - Piping System - 1956 RenewalUrgent
Exterior Windows - Single Wooden - 1956 Windows RenewalUrgent
Roof Coverings - Section A,A1,B to B3,D,D1 RenewalUrgent
Standard Foundations Repairs - Damp proofing Repairs RenewalUrgent
Steam Boilers - Boiler 1 RenewalUrgent
Air Distribution, Heating & Cooling - Duct System - 1956 RenewalHigh
Air Handling Units - SF #1 RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalHigh
Auxiliary Equipment - Stacks & Breaching RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts - 1956 RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302003 Floor Finishes - Wood RenewalHigh
C302004 Floor Finishes - Vinyl Tile - Older RenewalHigh
Ceiling Finishes - 1/F & 2/F Suspended Acoustic Ceiling Panels - Older RenewalHigh
Ceiling Finishes - Gypsum Board Ceiling - Washrooms RenewalHigh
Controls and Instrumentation - BAS RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - DX Split RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Eyewash Stations RenewalHigh
Domestic Water Distribution - Natural Gas DWH RenewalHigh
Domestic Water Distribution - Pipes and Fittings - 1956 RenewalHigh
Domestic Water Distribution - Sump Pump RenewalHigh
Exhaust Systems RenewalHigh
Exterior Doors - Hardware - Painted Hollow Metal RenewalHigh
Exterior Doors - Painted Hollow Metal Doors - Older RenewalHigh
Exterior Walls - Masonry Re-pointing RenewalHigh
Fencing & Gates - Perimeter Chain Link Fence RenewalHigh
Fencing & Gates - Perimeter Wrought Iron Fencing - Site RenewalHigh
Fin Tube Radiation Units - Perimeter Heating - 1956 RenewalHigh
Fittings - Millwork - 1956 Construction RenewalHigh
Floor Finishes - Carpet - Library RenewalHigh
Floor Finishes - Rubber Floor - Gymnasium RenewalHigh
Interior Doors - Hardware - Older RenewalHigh
Interior Doors - Original Building - Painted Wood and Hollow Metal RenewalHigh
Playing Fields - Grass Covered Playground - Baseball Diamond - Unpaved RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Retaining Walls - Poured Concrete RenewalHigh
Roof Coverings - Section C RenewalHigh
Sanitary Waste - Piping - 1956 RenewalHigh
Wall Finishes - Ceramic Tile - Washrooms RenewalHigh
Wall Finishes -Drywall and Concrete Block- Painted RenewalHigh
Fittings - Millwork - 1999 Building RenewalMedium
Fittings - Prefinished Metal Partitions RenewalMedium
Floor Finishes - Sheet Vinyl - 3/F Corridors RenewalMedium
Playing Fields - Asphalt Paved RenewalMedium
Playing Fields - Volleyball Court - Paved RenewalMedium
Retaining Walls - Stone Block - Southwest Corner RenewalMedium
Signage - Printed Wall Mounted - North Elevation RenewalMedium
Exterior Doors - Automtaic Device - Main Entrances RenewalLow
Fittings - Chalkboards - 1956 Building RenewalLow
Interior Doors - Hardware - Painted Metal RenewalLow
Interior Doors - Painted Metal RenewalLow
Interior Stair Construction - 1956 Building RenewalLow
Interior Stair Construction - Poured Concrete RenewalLow
Landscaping - Site Landscaping RenewalLow
Playing Fields - Playscape - East Side - Unpaved RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.