| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Auxiliary Equipment - Expansion Tank Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Energy Supply System - Natural Gas Renewal | Urgent |
| Heated Water Distribution System - Pipes and Fittings Renewal | Urgent |
| Hot Water Boilers - Boiler #1 Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Air Handling Units - SF #1 Renewal | High |
| Auxiliary Equipment - HVAC Pumps Renewal | High |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| B201020 Exterior Walls - Granular impregnated wall board Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Windows - Older & Localized Deficiencies Renewal | High |
| Fencing & Gates - Fencing Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Hardwood - GPR Renewal | High |
| Floor Finishes - Terrazzo Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
| Pedestrian Paving - Various Areas Renewal | High |
| Playing Fields - Paved Renewal | High |
| Playing Fields - Unpaved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Sanitary Waste Renewal | High |
| Stair Finishes Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Painted - Entire Building Renewal | High |
| Air Distribution, Heating & Cooling - Ductwork Renewal | Medium |
| B308020 Exterior Soffits Renewal | Medium |
| C2010 Stair Construction - Metal framed and concrete framed Renewal | Medium |
| Ceiling Finishes - Suspended Acoustic Panel Ceiling Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Medium |
| Domestic Water Distribution - DHWH #1 Renewal | Medium |
| Domestic Water Distribution - DHWH #2 Renewal | Medium |
| Interior Doors - 1956 Renewal | Medium |
| Interior Doors - Hardware Renewal | Medium |
| Major Repair [Partitions - Cracking in Gym Wall] | Medium |
| Roof Top AHU - Heat & Cool - RTU #1 Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Stormwater Management Renewal | Medium |
| Study [Partitions - Cracking in Gym Wall] | Medium |
| Emergency Lighting & Power - Inverter Renewal | Low |