2019 (calendar year)

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.

F.C.I.
64.38 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 23,400 different repairs needed in our schools. The total value of those repairs was $3.5 billion as of October 2019.

For the 2019-2020 school year, the TDSB will receive $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

 

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).

Brief DescriptionPriority
A101004 Standard Foundations Repairs - Parging repairs RenewalUrgent
Auxiliary Equipment - Stack & Breaching RenewalUrgent
B3010 Roof Coverings - BUR - Modified Bitumen A2 RenewalUrgent
D302050 Auxiliary Equipment - Chemical Feed System - New RenewalUrgent
D302051 Auxiliary Equipment - Expansion Tanks RenewalUrgent
D302054 Auxiliary Equipment - HVAC Pumps RenewalUrgent
Hot Water Boilers - Atmospheric RenewalUrgent
Main Switchboards - Main Disconnnect RenewalUrgent
Main Switchboards - Main Distribution Panel RenewalUrgent
Secondary - Transformers RenewalUrgent
Air Distribution, Heating & Cooling - Duct System RenewalHigh
Air Handling Units - Original Building RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Suspended Acoustic Panel Ceiling RenewalHigh
Controls & Instrumentation - Original Building - BAS RenewalHigh
D201001 Plumbing Fixtures - Water Closets RenewalHigh
D201003 Plumbing Fixtures - Lavatories RenewalHigh
D301002 Energy Supply System - Natural Gas RenewalHigh
D303099 Cooling Generating Systems - DX Split AHU - Cool - 1995 RenewalHigh
D303099 Cooling Generating Systems - DX Split AHU - Cool RenewalHigh
D304007 Distribution Systems - Exhaust Systems - Axial RenewalHigh
D305003 Fan Coil Units - Hydronic RenewalHigh
D306003 Controls and Instrumentation - Pneumatic RenewalHigh
D502004 Lighting and Branch Wiring - Exterior Lighting - Pole Mounted RenewalHigh
D502004 Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Domestic Water Distribution - Plumbing Piping Systems RenewalHigh
Domestic Water distribution - StudyHigh
Exterior Doors - Original Building RenewalHigh
Exterior Windows - All RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Sheet Vinyl RenewalHigh
G202003 Parking Lots - Paved - Resurface Asphalt Paved Parking Area RenewalHigh
G204071 Playing Fields - Unpaved RenewalHigh
G204072 Playing Fields - Asphalt School Playground RenewalHigh
G30 - Underground Utilities - 1975 RenewalHigh
Heating/Chilling water distribution systems - Original Building RenewalHigh
B203008 Exterior Doors - Hardware RenewalMedium
Branch Wiring - Cabling, Raceways & Bus Ducts RenewalMedium
Branch Wiring - StudyMedium
C1010 Partitions - Localized Deficiencies RenewalMedium
C102007 Interior Doors - Hardware RenewalMedium
C103001 Fittings - Washroom Partitions - Water Closet RenewalMedium
C103009 Fittings - Millwork - Classrooms RenewalMedium
Interior Doors - Original Building RenewalMedium
Stormwater Management - Original Building RenewalMedium