Toronto District School Board
Skip to main content

Please note: We will be publishing updates for the Facility Condition Index and Renewal Needs Backlog sometime in the Spring of 2021.

Agincourt Junior Public School

Facility Condition Index

2019 (calendar year)

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.

F.C.I.
66.18 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 23,400 different repairs needed in our schools. The total value of those repairs was $3.5 billion as of October 2019.

For the 2019-2020 school year, the TDSB will receive $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

 

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).

Brief DescriptionPriority
Auxiliary Equipment - Boiler breaching RenewalUrgent
Auxiliary Equipment - Condensate return pump RenewalUrgent
Hot Water Boilers - Boiler #1 RenewalUrgent
Roof Coverings - Section AB1,AB2,BC1,CD1 RenewalUrgent
Branch Wiring - Aged electrical system RenewalHigh
Domestic Water Distribution - Hot water tanks RenewalHigh
Energy Supply - Aged piping - GAS RenewalHigh
Exterior Doors - Wood Doors & Hardware RenewalHigh
Fencing & Gates - Chain link fence RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Vinyl floor tile RenewalHigh
Heating/Chilling water distribution systems - Piping RenewalHigh
Lighting Equipment - Building mounted exterior lighting fixtures RenewalHigh
Lighting Equipment - Entire building RenewalHigh
Lighting Equipment - Interior exit lighting RenewalHigh
Lighting Equipment - T-12 Fluorescent lighting RenewalHigh
Major Repair [Standard Foundations - Localized Deficiencies]High
Playing Fields - Paved RenewalHigh
Site Civil/Mechanical Utilities - All utilities RenewalHigh
Terminal & Package Units - Radiators & unit heaters RenewalHigh
Ceiling Finishes - Acoustic tiles RenewalMedium
Domestic Water Distribution -Plumbing Piping System RenewalMedium
Exhaust Systems - RT Exhaust fans RenewalMedium
Exterior Walls - 1914 Construction RenewalMedium
Exterior Windows - 1914 Construction - Basement windows RenewalMedium
Fittings - Millwork RenewalMedium
Fittings - Washroom partitions RenewalMedium
Interior Doors - Wood Doors & Hardware RenewalMedium
Interior Stair Construction - Rubber treads RenewalMedium
Parking Lots - West side RenewalMedium
Partitions - 1914 - Localized Deficiencies RenewalMedium
Pedestrian Paving - Asphalt/Concrete walkways RenewalMedium
Plumbing Fixtures - Original fixtures RenewalMedium
Standard Foundations - 1914 Construction RenewalMedium
Stormwater Management - Stormwater infiltration RenewalMedium
Structural Frame - 1914 Construction RenewalMedium
Wall Finishes - Paint RenewalMedium
Exterior Doors - Door hardware RenewalLow
Fencing & Gates - Concrete steps RenewalLow
Fittings - Basketball Nets RenewalLow
Fittings - Chalkboards RenewalLow
Fittings - Drapes RenewalLow
Floor Finishes - Hardwood floor - Gymnasium & stage [Wood Parquet] RenewalLow
Floor Finishes - Terrazzo RenewalLow
Interior Doors - Hardware RenewalLow
Landscaping - All soft landscaping RenewalLow
Pedestrian Paving - Swing gate RenewalLow
Playing Fields - Unpaved - Baseball diamond/grass field RenewalLow
Playing Fields - Unpaved - Belair playscape RenewalLow
Rain Water Drainage - Sump Pump RenewalLow
Roadways - Asphalt paved RenewalLow
Signage - Wall mounted signage RenewalLow

© 2014 Toronto District School Board  |  Terms of Use  |  Privacy   |  CASL