| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Stacks and Breaching Renewal | Urgent |
| Exterior Windows - All Elevations Renewal | Urgent |
| Gas Supply System Renewal | Urgent |
| Heating/Chilling water distribution systems Renewal | Urgent |
| Hot Water Boilers - Boiler #1 Renewal | Urgent |
| Hot Water Boilers - Boiler #2 Renewal | Urgent |
| Hot Water Boilers - Boiler #3 Renewal | Urgent |
| Other Special Systems and Devices Renewal | Urgent |
| Roof Coverings - Section G2,I5 Renewal | Urgent |
| Secondary - Substation Transformer Renewal | Urgent |
| Secondary Switchboards Renewal | Urgent |
| Secondary Transformers Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Air Handling Units - Supply Fans Renewal | High |
| Branch Wiring Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
| C103002 Fittings - Washroom Accessories Renewal | High |
| C103005 Fittings - Lockers Renewal | High |
| C103010 Fittings - Millwork - Laboratories Renewal | High |
| C103017 Fittings - Auditorium Seating Renewal | High |
| C301012 Wall Finishes - Porcelain Renewal | High |
| C302001 Floor Finishes - Ceramic Renewal | High |
| C303002 Ceiling Finishes - Plaster & Sprayed Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Renewal | High |
| Chilled Water Systems - Chiller Renewal | High |
| Chilled Water Systems - Cooling Tower Renewal | High |
| Cooling Generating Systems - Packaged Window AC Units Renewal | High |
| Cooling Generating Systems - Rooftop Condensers Renewal | High |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | High |
| Domestic Water Distribution - DHW Storage Tank Renewal | High |
| Domestic Water Distribution - Plumbing Piping System Renewal | High |
| Exhaust Systems - Original Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Overhead Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing & Gates - Site Improvements Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Floor Finishes - Terrazzo Renewal | High |
| Floor Finishes - Vinyl Tile Renewal | High |
| G203003 Pedestrian Paving - Asphalt Paved Walkway Renewal | High |
| Lighting Equipment - Exterior Lighting Renewal | High |
| Parking Lots - Paved - Asphalt Paved Parking Area & Roadway Renewal | High |
| Perimeter Heating - Terminal Units Renewal | High |
| Playing Fields - Running Track Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Plumbing Fixtures - Water Fountains Renewal | High |
| Site Civil/Mechanical Utilities Renewal | High |
| Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Stormwater Management Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Painted Renewal | High |
| Auxiliary Equipment - Heat Exchanger - Pool Renewal | Medium |
| C102007 Interior Doors - Hardware Renewal | Medium |
| C303005 Ceiling Finishes - Wood Renewal | Medium |
| Controls & Instrumentation -BAS Renewal | Medium |
| Domestic Water Distribution - Swimming Pool & Systems Renewal | Medium |
| Interior Doors Renewal | Medium |
| Other Heat Generating Systems - Heat&Cool [1] - RTUs Renewal | Medium |
| Playing Fields - Paved Renewal | Medium |
| Playing Fields - Unpaved Renewal | Medium |
| Domestic Water Distribution - Water Bottle Refill Station Renewal | Low |
| Emergency Lighting & Power - Generator Renewal | Low |
| Pedestrian Paving Renewal | Low |