| Brief Description | Priority |
| Auxiliary Equipment - Variable Frequency Drives (VFD) Renewal | Urgent |
| Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
| Exterior Windows - Original 1975 & Greenhouse Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Secondary - Transformers Renewal | Urgent |
| Site Civil/Mechanical Utilities Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct System Renewal | High |
| Air Handling Units - AHU #2, #3, #4 and #5 Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| C302015 Floor Finishes - Vinyl Sheet Corridor Renewal | High |
| C303006 Ceiling Finishes - Paint Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - CU - Carrier Renewal | High |
| Cooling Generating Systems - CU - Eng Air Renewal | High |
| Cooling Generating Systems - CU - Keeprite Renewal | High |
| Cooling Generating Systems - DX Split - Cafe and Staff Dining Renewal | High |
| Domestic Water Distribution - DHW Pumps Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Water Storage Tank Renewal | High |
| Exhaust Systems Renewal | High |
| Exhaust Systems Renewal | High |
| Exterior Door Hardware - Original Building Renewal | High |
| Exterior Doors - Older Original Building Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing & Gates - Chain Link Fence Renewal | High |
| Fencing & Gates - Timber Stair Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Floor Finishes - Terrazzo Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Interior Doors - Hardware Renewal | High |
| Interior Doors - Older Renewal | High |
| Make - Up AHU #4, #6, #7 and #10 Renewal | High |
| Other Special Systems and Devices - Dust Collector Renewal | High |
| Overhead and Roll-up Doors Renewal | High |
| Parking Lots - Asphalt Renewal | High |
| Pedestrian Paving - Asphalt & Concrete Renewal | High |
| Plumbing Fixtures - Washrooms Renewal | High |
| Roadways - Asphalt Renewal | High |
| Roof Top AHU - Heat & Cool - HVAC #1 Renewal | High |
| Sanitary Waste - Piping Renewal | High |
| Stormwater Management Renewal | High |
| Wall Finishes - Painted Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
| Ceiling Finishes - Suspended Acoustic Panel Ceiling Renewal | Medium |
| Fencing & Gates - Concrete Ramp Renewal | Medium |
| Fencing & Gates - Patio Renewal | Medium |
| Floor Finishes - Sheet Vinyl Renewal | Medium |
| Playing Fields - Paved Renewal | Medium |
| Playing Fields - Soccer Field - Unpaved Renewal | Medium |
| Retaining Walls - Concrete Renewal | Medium |
| Signage - Wall Mounted Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Interior Stair Construction - Concrete Renewal | Low |
| Interior Stair Construction - Metal Framed Renewal | Low |
| Landscaping Renewal | Low |