Toronto District School Board
Skip to main content

Pleasant Public School

Facility Condition Index

2019 (calendar year)

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.

F.C.I.
50.19 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 23,400 different repairs needed in our schools. The total value of those repairs was $3.5 billion as of October 2019.

For the 2019-2020 school year, the TDSB will receive $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).

Air Handling Units RenewalUrgent
Domestic Water Distribution - Electrical DHW RenewalUrgent
Domestic Water Distribution - Plumbing Piping RenewalUrgent
Exterior Doors & Hardware RenewalUrgent
Exterior Windows - Original RenewalUrgent
Fittings - Millwork RenewalUrgent
Fittings - Washroom Partitions RenewalUrgent
Floor Finishes - Vinyl Tiles RenewalUrgent
Heating/Chilling water distribution systems RenewalUrgent
Lighting Equipment - Emergency Lighting RenewalUrgent
Lighting Equipment - Exterior RenewalUrgent
Main Switchboards - Main Disconnect RenewalUrgent
Other Heat Generating Systems - Cool [1] RenewalUrgent
Playing Fields - Paved RenewalUrgent
Playing Fields - Unpaved RenewalUrgent
Roof Coverings - A,C,B1 RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Stairs RenewalUrgent
Study [Domestic Water Distribution - Plumbing Piping]Urgent
Study [Heating/Chilling water distribution systems]Urgent
Study [Site Civil/Mechanical Utilities]Urgent
Terminal & Package Units - Force Flow Heater & Radiator RenewalUrgent
Branch Wiring RenewalHigh
Ceiling Finishes - Acoustic Tile RenewalHigh
Exhaust Systems RenewalHigh
Interior Doors & Hardware RenewalHigh
Parking Lots RenewalHigh
Pedestrian Paving RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Roadways RenewalHigh
Stormwater Management RenewalHigh
Study [Branch Wiring]High
Wall Finishes - Ceramic Tile RenewalHigh
Wall Finishes - Paint RenewalHigh

© 2014 Toronto District School Board  |  Terms of Use  |  Privacy   |  CASL