| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Exterior Windows - Original Windows Renewal | Urgent |
| Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Air Handling Units - SF #1 and #2 Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Acoustic Tile Ceiling Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Energy Supply System - Natural Gas Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Metal Renewal | High |
| Exterior Walls - Wooden Cladding Renewal | High |
| Fencing & Gates - Chain Link Fence Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Hardwood - Gymnasium & Stage [Wood Strip] Renewal | High |
| Heated Water Distribution Systems - Pipes and Fittings Renewal | High |
| Interior Doors - Wood Renewal | High |
| Interior Doors - Hardware Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Parking Lots - Asphalt Renewal | High |
| Playing Fields - Paved Renewal | High |
| Playing Fields - Unpaved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Rain Water Drainage Renewal | High |
| Sanitary Waste Renewal | High |
| Wall Finishes - Painted - Classrooms Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Medium |
| Controls and Instrumentation - BAS Renewal | Medium |
| Fittings - Fittings & Equipment Renewal | Medium |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | Medium |
| Other Electrical - Emergency Lighting and Power - UPS Renewal | Medium |
| Pedestrian Paving Renewal | Medium |
| Signage Renewal | Medium |
| Stair Construction Renewal | Medium |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | Low |
| Fittings - Blinds Renewal | Low |
| Fittings - Chalkboards Renewal | Low |
| Fittings - Dust Collector Renewal | Low |
| Landscaping Renewal | Low |
| Other Special Systems and Devices - Dust Collector - Small Renewal | Low |
| Plumbing Fixtures - Lavatories Renewal | Low |
| Wall Finishes - Painted - Common Areas Renewal | Low |