Lillian Public School

Facility Condition Index

2019 (calendar year)

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.

F.C.I.
63.37 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 23,400 different repairs needed in our schools. The total value of those repairs was $3.5 billion as of October 2019.

For the 2019-2020 school year, the TDSB will receive $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).

Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Main Switchboards - 1950 Construction RenewalUrgent
Other Heat Generating Systems -Window A/C Units RenewalUrgent
Roof Coverings - Section D RenewalUrgent
Secondary - 1950 Construction RenewalUrgent
Air Handling Units - AHU # 1 RenewalHigh
Air Handling Units - AHU # 2 RenewalHigh
Branch Wiring - 1950 Construction RenewalHigh
Controls & Instrumentation - Pneumatics - BAS RenewalHigh
Domestic Water Distribution - Sump Pump RenewalHigh
Exhaust Systems - Axial Roof Top Fans RenewalHigh
Exhaust Systems - Centrifugal Fan RenewalHigh
Exterior Doors & Hardware RenewalHigh
Exterior Walls - 1948 Construction RenewalHigh
Exterior Walls - 1958 Construction RenewalHigh
Fencing & Gates - Chain link fencing RenewalHigh
Floor Finishes - Carpet RenewalHigh
Heating/Chilling water distribution systems - 1950 Construction - HTG Piping RenewalHigh
Interior Stair Construction RenewalHigh
Lighting Equipment - Emergency RenewalHigh
Lighting Equipment - Exterior RenewalHigh
Parking Lots - Paved RenewalHigh
Playing Fields - Paved RenewalHigh
Playing Fields - Unpaved Sports & Recreational Spaces RenewalHigh
Plumbing Fixtures - 15 % Old RenewalHigh
Replacement [Air Handling Units - AHU # 1]High
Replacement [Air Handling Units - AHU # 2]High
Roof Coverings - Section C,F RenewalHigh
Site Civil/Mechanical Utilities - 1950 Construction RenewalHigh
Structural Frame - 1948 Construction - Localized deficiencies RenewalHigh
Study [Structural Frame - 1948 Construction - Localized deficiencies]High
Wall Finishes - Paint RenewalHigh
Ceiling Finishes - Acoustic Tiles RenewalMedium
Domestic Water Distribution - 1950 Construction - Plumbing Piping System RenewalMedium
Exterior Windows - Original Building RenewalMedium
Fittings - Millwork RenewalMedium
Fittings - Washroom Partitions RenewalMedium
Floor Finishes - Vinyl Tiles RenewalMedium
Interior Doors & Hardware RenewalMedium
Interior Stair Construction - 1 No. RenewalMedium
Interior Stair Construction - 3 No. RenewalMedium
Main Switchboards - 1950 & 1968 RenewalMedium
Pedestrian Paving - Asphalt, Concrete RenewalMedium
Roadways - Asphalt Paved RenewalMedium
Roof Coverings - Access Ladder RenewalMedium
Roof Coverings - Section A,E RenewalMedium
Ceiling Finishes - T -Bar Common Area RenewalLow
Ceiling Finishes - T- Bar Classroom RenewalLow
Exterior Doors - Hardware - All RenewalLow
Fencing & Gates - Site Related Stairs, Plazas & Decks RenewalLow
Fittings - Window Coverings RenewalLow
Floor Finishes - Hardwood RenewalLow
Interior Doors - Hardware - All RenewalLow
Landscaping RenewalLow
Playing Fields - Unpaved - Playscape RenewalLow
Retaining Walls - Wood RenewalLow
Signage RenewalLow
Terminal & Package Units - Force Flow & Unit Heaters RenewalLow
Wall Finishes - Paint Wallcovering - Common Areas RenewalLow
Wall Finishes - Waterproofing RenewalLow