| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Parging repairs - Localized Deficiencies Renewal | Urgent |
| B2020 Exterior Windows - Older Renewal | Urgent |
| B3010 Roof Coverings - Section A1,A2 Renewal | Urgent |
| B302006 Roof Openings - Skylights Domed Acrylic Renewal | Urgent |
| Fencing & Gates - Fencing Renewal | Urgent |
| Roof Coverings - Section B3,B5 Renewal | Urgent |
| Superstructure - Structural Frame - Localized Deficiencies Renewal | Urgent |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| B201014 Exterior Walls - Masonry Re-pointing - Localized Deficiencies Renewal | High |
| B2030 Exterior Doors - Hollow Metal - Older Renewal | High |
| B203008 Exterior Doors - Hardware - Older Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories - Older Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Acoustic Tile Renewal | High |
| Controls & Instrumentation - Entire System - Pneumatic Controls Renewal | High |
| D201002 Plumbing Fixtures - Urinals Renewal | High |
| D302054 Auxiliary Equipment - HVAC Pumps - Entire System Renewal | High |
| D305004 Fin Tube Radiation Units - Entire School Renewal | High |
| D305099 Terminal and Package Units - RT HVAC Units Renewal | High |
| D305099 Terminal and Package Units - RTU-1 Renewal | High |
| D305099 Terminal and Package Units - RTU-10 Renewal | High |
| D305099 Terminal and Package Units - RTU-11 Renewal | High |
| D305099 Terminal and Package Units - RTU-2 Renewal | High |
| D305099 Terminal and Package Units - RTU-3 Renewal | High |
| D305099 Terminal and Package Units - RTU-4 Renewal | High |
| D305099 Terminal and Package Units - RTU-5 Renewal | High |
| D305099 Terminal and Package Units - RTU-6 Renewal | High |
| D305099 Terminal and Package Units - RTU-7 Renewal | High |
| D305099 Terminal and Package Units - RTU-8 Renewal | High |
| D305099 Terminal and Package Units - RTU-9 Renewal | High |
| D502001 Lighting and Branch Wiring - Branch Wiring Renewal | High |
| D502004 Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
| D509096 Other Special Systems and Devices - Shop Compressed Air Systems Renewal | High |
| Exhaust Systems - Entire System Renewal | High |
| Fittings - Bleachers Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Hardwood - Gym Renewal | High |
| Floor Finishes - Sheet Vinyl - General Classrooms Renewal | High |
| Floor Finishes - Terrazzo Renewal | High |
| G201003 Roadways - Paved - Reconstruct Asphalt Paved Roadway - North Renewal | High |
| G30 - Underground Utilities Renewal | High |
| Heated/Chilled Water Distribution Systems - Piping System Renewal | High |
| Interior Doors Renewal | High |
| Interior Doors - Hardware - Entire Building Renewal | High |
| Partitions - Localized Deficiencies Renewal | High |
| Pedestrian Paving - Walkways Renewal | High |
| Playing Fields - Unpaved - Sod Renewal | High |
| Playing Fields - Unpaved - Track Renewal | High |
| Stormwater Management - Catch Basins Renewal | High |
| Wall Finishes - CeramicTile Renewal | High |
| Wall Finishes - Paint Renewal | High |
| Air Handling Units - Original Unit - 1 Renewal | Medium |
| Air Handling Units - Original Unit - 2 Renewal | Medium |
| Air Handling Units - Original Unit - 3 Renewal | Medium |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
| D201003 Plumbing Fixtures - Lavatories - Science Labs Renewal | Medium |
| D201006 Domestic Water Distribution - Drinking Fountains and Coolers Renewal | Medium |
| Fittings - Walk in Freezers Renewal | Medium |
| Other Heat Generating Systems - RT MU-AHU Renewal | Medium |
| Rain Water Drainage Renewal | Medium |
| Sanitary Waste Renewal | Medium |