Albion Heights Junior Middle School

Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
64.57 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion Tank RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302004 Floor Finishes - Vinyl Tile - Older RenewalHigh
Ceiling Finishes - Suspended Acoustic Panel Ceilings RenewalHigh
Controls and Instrumentation - Electronic/BAS RenewalHigh
Distribution Systems - Exhaust Systems - Axial RenewalHigh
Domestic Water Distribution - DHWH #1 RenewalHigh
Exterior Doors - All Doors RenewalHigh
Exterior Walls - Joint Sealant - Windows RenewalHigh
Exterior Windows - Original Units RenewalHigh
Fencing & Gates - Chain Link Fence RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork - Classooms - Older RenewalHigh
Floor Finishes - Carpeting RenewalHigh
Floor Finishes - Terrazzo - Epoxy RenewalHigh
Interior Doors - Hardware RenewalHigh
Interior Doors - Wood & Metal Doors RenewalHigh
Lighting Equipment - Exterior - Wall Mounted RenewalHigh
Main Switchboards - Switchgear RenewalHigh
Pedestrian Paving - Concrete Paved Walkways RenewalHigh
Playing Fields - Asphalt Paved Playground RenewalHigh
Playing Fields - Grass Surfaced Playground - Sports Field - Unpaved RenewalHigh
Roadways - Drop-off Bus & Car Loop RenewalHigh
Roof Top AHU - RTU #1, #2, #3, #4, #5, & #6 RenewalHigh
Secondary Transformers RenewalHigh
Wall Finishes - Painted RenewalHigh
Air Distribution, Heating & Cooling - Duct System RenewalMedium
Auxiliary Equipment - Chemical Feed System RenewalMedium
Domestic Water Distribution - DHW Pumps RenewalMedium
Domestic Water Distribution - DHWH #2 RenewalMedium
Domestic Water Distribution - Drinking Fountains and Coolers RenewalMedium
Energy Supply System - Natural Gas RenewalMedium
Exit Lighting and Signs RenewalMedium
Exterior Doors - Hardware RenewalMedium
Floor Finishes - Ceramic Tiles RenewalMedium
Floor Finishes - Vinyl Tile - Newer RenewalMedium
Floor Finishes - Vinyl Tiles - Gymnasium RenewalMedium
Interior Stair Construction - Four Sets RenewalMedium
Lighting Equipment - Exterior - Pole RenewalMedium
Lighting Equipment - Interior Lighting RenewalMedium
Plumbing Fixtures - Lavatories RenewalMedium
Plumbing Fixtures - Urinals RenewalMedium
Plumbing Fixtures - Water Closets RenewalMedium
Retaining Walls - Playstructure - Timber RenewalMedium
Sanitary Waste - Piping RenewalMedium
Signage - Wall Mounted Letters RenewalMedium
Site Civil/Mechanical Utilities RenewalMedium
Controls & Instrumentation - EMS RenewalLow
Emergency Lighting & Power - Inverter RenewalLow
Exterior Doors - Automatic Device - Front Door RenewalLow
Fittings - Chalkboards RenewalLow
Fittings - Lockers RenewalLow
Fittings - Remaining Blinds RenewalLow
Landscaping - Planters and School Property RenewalLow
Playing Fields - Henderson Playscape - Unpaved RenewalLow
Playing Fields - JK / SK Playscape - Unpaved RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.