| Brief Description | Priority |
| Auxiliary Equipment - Chemical Feed System Renewal | Urgent |
| Auxiliary Equipment - Expansion Tanks 3 & 4 Renewal | Urgent |
| Auxiliary Equipment - HVAC Circ Pumps Renewal | Urgent |
| B201011 Exterior Walls - Joint Sealant Renewal | Urgent |
| Energy Supply - Gas Piping System Renewal | Urgent |
| Exterior Windows Renewal | Urgent |
| Floor Finishes - Hardwood Renewal | Urgent |
| Hot Water Boilers - Boiler - 1 Renewal | Urgent |
| Hot Water Boilers - Boiler - 2 Renewal | Urgent |
| Main Switchboards Renewal | Urgent |
| Other Heat Generating Systems - AHU CLG Office Renewal | Urgent |
| Other Heat Generating Systems - Pod classrooms - RT AHU CLG 2 Renewal | Urgent |
| Roof Coverings - Section A,C3,C4 Renewal | Urgent |
| Air Handling Units - Classrooms Renewal | High |
| Air Handling Units - General purpose room Renewal | High |
| Air Handling Units - Resource Centre Renewal | High |
| B2030 Exterior Doors - Hollow Metal Renewal | High |
| B308020 Exterior Soffits Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C1030 - Fittings - Washroom - Older Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Acoustic Tiles Renewal | High |
| D201003 Plumbing Fixtures - Lavatories Renewal | High |
| D202001 Domestic Water Distribution - Pipes and Fittings Renewal | High |
| D202031 Domestic Water Distribution - Electric Hot Water Heaters Renewal | High |
| D304003 Distribution Systems - Heated/Cilled Water Distribution Systems - Piping System Renewal | High |
| D304007 Distribution Systems - Exhaust Systems Renewal | High |
| D306003 Controls and Instrumentation - Pneumatic Renewal | High |
| D502001 Lighting and Branch Wiring - Branch Wiring Renewal | High |
| D509097 Other Special Systems and Devices - Dust Collector Renewal | High |
| Domestic Water Distribution - Backflow Preventers Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Fencing & Gates - Chain link fence Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes- Terrazzo Renewal | High |
| Interior Doors Renewal | High |
| Interior Doors - Hardware - 35 doors Renewal | High |
| Parking Lots - Paved -West & SW Renewal | High |
| Partitions - Localized Deficiencies Renewal | High |
| Pedestrian Paving - Asphalt & concrete walkways Renewal | High |
| Playing Fields - Paved Renewal | High |
| Playing Fields - Unpaved Renewal | High |
| Roadways - Bus loop Renewal | High |
| Roof Coverings - Section AE1,AE2 Renewal | High |
| Stair Finishes Renewal | High |
| Stormwater Management - Storm Sewer Renewal | High |
| Terminal & Package Units - Fin tube cabinets, Fan forced unit & Unit heaters Renewal | High |
| Wall Finishes - Paint Renewal | High |
| Air Distribution, Heating & Cooling - Duct Systems Renewal | Medium |
| D201001 Plumbing Fixtures - Water Closets Renewal | Medium |
| D202030 Domestic Water Distribution - Natural Gas DWH Renewal | Medium |
| Emergency Lighting & Power - Inverter Renewal | Medium |
| Rain Water Drainage Renewal | Medium |
| Sanitary Waste Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Fittings - Dust collector Renewal | Low |
| Plumbing Fixtures - Eye wash station # 2 Boiler room # 2 Renewal | Low |
| Plumbing Fixtures - Eye wash station #1 Boiler room # 1 Renewal | Low |
| Plumbing Fixtures - Eye wash station #3 Janitor room Renewal | Low |