Toronto District School Board
Skip to main content

Willow Park Junior Public School (GR. JK-06)

Health and Safety (H&S) workplace inspections are conducted every month in all of our 582 operating schools. Below you can find the H&S reports for your school, for the 2021-2022 school years.  More information and Frequently Asked Questions

Date InspectedLocation in SchoolHealth & Safety Issue ObservedClassAction Taken ByDate Action TakenDetails
10/21/2122extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BPrincipal10/26/21Details
10/21/2121household cleaners present (not TDSB approved)BPrincipal10/26/21Details
10/21/21Sensory Roominappropriate storage of materials/furniture/shelving, or clutterBPrincipal10/26/21Details
10/21/2123extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BPrincipal10/26/21Details
10/21/2126inappropriate storage of materials/furniture/shelving, or clutterBPrincipal10/26/21Details
10/21/21Boiler roomunable to inspect (specify why if possible)BCaretaker10/25/21Details
10/21/21caretakng storageexhaust - exhaust required repairACaretaker10/28/21Details
10/21/21Office Storageunable to inspect (specify why if possible)BPrincipal10/26/21Details
10/21/21Storage 3exposed wiring/damaged cord/ground pin missingACaretaker11/01/21Details
11/18/21Boiler roomventilation (specify)ACaretaker11/18/21Details
11/18/21Boiler roomunable to inspect (specify why if possible)BCaretaker11/18/21Details
11/18/2115ceiling tiles missing/looseACaretaker11/18/21Details
11/18/2116lighting in need of repair (maintenance issue)ACaretaker11/18/21Details
12/07/2110fire exit route sign (yellow TDSB) - not posted / requires updatingBPrincipal12/07/21Details
01/30/22Health and Safety Bulletin BoardEmployee's Report of Workplace Violent Incident posted?BPrincipal01/31/22Details
01/30/22Boiler roomunable to inspect (specify why if possible)BPrincipal01/31/22Details
01/30/22Health and Safety Bulletin BoardNames and Locations of Certified First Aiders on site posted?BPrincipal01/31/22Details
03/24/2217lighting in need of repair (maintenance issue)ACaretaker03/28/22Details
03/24/2218inappropriate storage of materials/furniture/shelving, or clutterBPrincipal03/28/22Details
03/24/22Hallceiling damaged (specify)ACaretaker03/28/22Details
03/24/22Exit 2leaking/pooling/ponding of water or liquid (be as specific as possible)ACaretaker03/28/22Details
04/15/22Boiler roomventilation (specify)ACaretaker04/19/22Details
04/15/22Boiler roomeyewash station required or in need of repair (specify)ACaretaker04/19/22Details
05/26/2215ceiling tiles missing/looseAPrincipal06/08/22Details
05/26/2211window covering damaged/in need of repairAPrincipal06/08/22Details
05/26/22Library officewindow covering recommended on 1st floor (emergency lockdown procedures)BPrincipal06/08/22Details
05/27/2215window covering damaged/in need of repairAPrincipal06/08/22Details
06/28/22Boiler roomeyewash station required or in need of repair (specify)A  Details
06/28/22Boiler roomhousekeeping, clutter, dust or dirtB  Details
06/28/224damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)A  Details
06/28/224lighting in need of repair (maintenance issue)A  Details
06/28/22reading recoverydoors not numbered properly (interior or exterior)B  Details
06/28/226ceiling tiles missing/looseA  Details
06/28/22Main officedamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)A  Details