| Brief Description | Priority |
| B101001 Structural Frame - Concrete Canopies Renewal | Urgent |
| B101001 Structural Frame - Gymnasium Renewal | Urgent |
| B302006 Roof Openings - Skyligts Domed Acrylic Renewal | Urgent |
| Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
| Roof Coverings - A1,A2,E,F2,F3,H1 Renewal | Urgent |
| Roof Coverings - Section E3,F1,G Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct System Renewal | High |
| Air Handling Units - SF #1 Thru #12 Renewal | High |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
| Branch Wiring Renewal | High |
| C1010 Partitions - Localized deficiencies Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories - Older Renewal | High |
| C302002 Floor Finishes - Terrazzo - Localized deficiencies Renewal | High |
| Ceiling Finishes - Paint Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exhaust Systems - Axial Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Exterior Doors - All - Hollow Metal and Solid Wood Older Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Fencing & Gates - Chain Link Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Floor Finishes - Painted/Sealed Concrete Floor Renewal | High |
| Floor Finishes - Vinyl Tile - Older Renewal | High |
| G204001 Fencing and Gates - Wrought Iron Fencing - Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs - Renewal | High |
| G204072 Playing Fields - Asphalt Running Track Renewal | High |
| Interior Doors - Aged - Hollow Metal and Wood Renewal | High |
| Interior Doors - Hardware Renewal | High |
| Lighting Equipment - Exterior - Wall Renewal | High |
| Parking Lots - Asphalt Renewal | High |
| Pedestrian Paving - Asphalt Renewal | High |
| Pedestrian Paving - Front Entrance - Concrete Paved Renewal | High |
| Playing Fields - Sports Field - Unpaved - Grass Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Sanitary Waste - Piping Renewal | High |
| Site Civil/Mechanical Utilities - All Renewal | High |
| Terminal & Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Painted Renewal | High |
| Auxiliary Equipment - Auxiliary Tanks Renewal | Medium |
| Auxiliary Equipment - Circulation Pumps Renewal | Medium |
| Controls and Instrumentation - BAS Renewal | Medium |
| Cooling Generating Systems - Rooftop Condensers Renewal | Medium |
| Domestic Water Distribution - Natural Gas DWH Renewal | Medium |
| Domestic Water Distribution - Sump Pumps Renewal | Medium |
| Elevators and Lifts - Passenger - Hydraulic Renewal | Medium |
| Fencing & Gates - Concrete - Stairs and Ramp Renewal | Medium |
| Floor Finishes - Vinyl Tile - Newer Renewal | Medium |
| Interior Stair Construction - Older Renewal | Medium |
| Lighting Equipment - Exterior - Pole Renewal | Medium |
| Main Switchboards - Switchgear Renewal | Medium |
| Partitions - 1924, 29 & 30 Construction - Plaster & Painted Concrete Block Renewal | Medium |
| Retaining Walls - Timber Renewal | Medium |
| Roof Coverings - Section H,L,L1,L2,M,M1,M2,N,N1 Renewal | Medium |
| ~A101004 Standard Foundations Repairs - Crack Injection Renewal | Medium |
| Plumbing Fixtures - Urinals Renewal | Low |