| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Roof Coverings - Section B3,C2 Renewal | Urgent |
| Standard Foundations Repairs - Damp proofing Repairs - Localized Deficiencies Renewal | Urgent |
| Auxiliary Equipment - Chemical Feed Systems Renewal | High |
| C1010 Partitions - Localized Deficiencies - Masonry Cracks Renewal | High |
| C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
| C103017 Fittings - Auditorium Seating Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Domestic Water Distribution - Circ. and Sump Pumps Renewal | High |
| Domestic Water Distribution - DHWB #1 and #2 Renewal | High |
| Domestic Water Distribution - DHWB #3 and #4 Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Hollow Metal Renewal | High |
| Fencing and Gates - Chain Link Fence Renewal | High |
| Fittings - Lockers Renewal | High |
| Floor Finishes - Sheet Vinyl Renewal | High |
| Floor Finishes - Vinyl Tiles Renewal | High |
| Other Heat Generating Systems - Cafeteria Heating Renewal | High |
| Playing Fields - Unpaved Renewal | High |
| Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Wrought Iron Fencing Renewal | High |
| Air Distribution, Heating & Cooling - Ductwork Renewal | Medium |
| C102007 Interior Doors - Hardware Renewal | Medium |
| C103002 Fittings - Washroom Accessories Renewal | Medium |
| C103005 Fittings - Lockers Renewal | Medium |
| Ceiling Finishes - Suspended Acoustic Panels Renewal | Medium |
| Controls & Instrumentation - BAS Renewal | Medium |
| Controls and Instrumentation - Pneumatic Renewal | Medium |
| Elevators and Lifts - Elevator #1 Renewal | Medium |
| Elevators and Lifts - Elevator #2 Renewal | Medium |
| Exterior Doors - Original Building Renewal | Medium |
| Exterior Doors - Overhead Doors Renewal | Medium |
| Exterior Walls - 1906 to 1948 Renewal | Medium |
| Exterior Walls - 1993 Renewal | Medium |
| Exterior Windows - Original Building Renewal | Medium |
| Fencing & Gates - Site Improvements Renewal | Medium |
| Floor Finishes - Ceramic Tiles Renewal | Medium |
| Interior Doors - 1994 Construction Renewal | Medium |
| Lighting Equipment - Exterior Renewal | Medium |
| Lighting Equipment - Interior Renewal | Medium |
| Pedestrian Paving - Concrete Paved Walkway Renewal | Medium |
| Playing Fields - Unpaved Renewal | Medium |
| Plumbing Fixtures - Bradley Basin Renewal | Medium |
| Plumbing Fixtures - Lavatories Renewal | Medium |
| Plumbing Fixtures - Urinals Renewal | Medium |
| Plumbing Fixtures - Water Closets Renewal | Medium |
| Plumbing Fixtures - Water Coolers Renewal | Medium |
| Retaining Walls - Original Building Renewal | Medium |
| Underground Utilities Renewal | Medium |
| Wall Finishes - Painted [2] Renewal | Medium |
| Ceiling Finishes - Linear Metal Panels Renewal | Low |
| Exterior Doors - Automatic Device Renewal | Low |
| Floor Finishes - Ceramic - Pool Renewal | Low |
| Other Electrical - Emergency Lighting and Power - Generator Renewal | Low |
| Parking Lots - Original Building Renewal | Low |
| Roadways - Original Building Renewal | Low |