| Brief Description | Priority |
| Auxiliary Equipment - Stack and Breaching Renewal | Urgent |
| Gas Supply System - Piping Renewal | Urgent |
| Heating/Chilling Water Distribution Systems - Piping Renewal | Urgent |
| Structural Frame - 1960 - Localized Deficiencies Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct System. Renewal | High |
| Air Handling Units - All Renewal | High |
| Branch Wiring Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C102007 Interior Doors - Hardware Renewal | High |
| C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
| C103002 Fittings - Washroom Accessories Renewal | High |
| C103009 Fittings - Millwork - Classrooms Renewal | High |
| C103010 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Fixed Acoustic Tiles Renewal | High |
| Ceiling Finishes - Suspended Acoustic Panel Renewal | High |
| Cooling Generating Systems - Window AC Renewal | High |
| Domestic Water Distribution - Plumbing Piping Renewal | High |
| Domestic Water Distribution - Sump Pumps Renewal | High |
| Exhaust Systems - Fans Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Hollow Metal and Wood Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Exterior Walls - North & East Elevation - Masonry Re-pointing Renewal | High |
| Fencing and Gates - Chain Link Fence Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Hardwood Renewal | High |
| Interior Doors - 1910 Building - Solid Wood Renewal | High |
| Lighting Equipment - Exterior Lighting - Wall or Soffit Mounted Renewal | High |
| Parking Lots - Paved - Asphalt Renewal | High |
| Pedestrian Paving - Walkway - Paved Renewal | High |
| Perimeter Heating - Terminal Units Renewal | High |
| Playing Fields - Asphalt School Playground Renewal | High |
| Playing Fields - Unpaved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Plumbing Fixtures - Water Coolers Renewal | High |
| Retaining Walls - Brick Renewal | High |
| Site Civil/Mechanical Utilities Renewal | High |
| Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Stormwater Management - Original Building Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Acoustic Wall Tiles Renewal | High |
| Wall Finishes - Painted (1910 Building) - Masonry, Plaster and Drywall Renewal | High |
| Wrought Iron Fencing Renewal | High |
| Domestic Water Distribution - Eyewash Stations Renewal | Medium |
| Lighting Equipment - Interior Lighting - T8 Renewal | Medium |
| Retaining Walls Renewal | Medium |
| Signage Renewal | Medium |
| Fittings - Chalkboards Renewal | Low |
| Fittings - Window Coverings- Drapes and Pull Down Shades Renewal | Low |
| Landscaping Renewal | Low |
| Playing Fields - Unpaved - Playscapes Renewal | Low |
| Playing Fields - Unpaved- Henderson Renewal | Low |
| Roadways - Asphalt Renewal | Low |
| Wall Finishes - Painted (1910 Building) Renewal | Low |
| Wall Finishes - Painted (1960 Building) Renewal | Low |