| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps - 1968 Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching - Boiler #1 Renewal | Urgent |
| Floor Finishes - Carpet Renewal | Urgent |
| Floor Finishes - Sheet Flooring Renewal | Urgent |
| Hot Water Boilers - Boiler #1 Renewal | Urgent |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | Urgent |
| Roof Coverings - Section A9,B,C,C1 Renewal | Urgent |
| Air Handling Units - SF #3 and #4 Renewal | High |
| Auxiliary Equipment - Chemical Feed Systems Renewal | High |
| Auxiliary Equipment - Variable Frequency Drives (VFD) Renewal | High |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| B203008 Exterior Doors - Hardware Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C1030 - Fittings - Washroom - OLder Renewal | High |
| C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
| Chilled Water Systems - Air-Cooled Chiller Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - RTU #1 Condensing Unit Renewal | High |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System - 1968 Renewal | High |
| Distribution Systems - Axial Renewal | High |
| Domestic Water Distribution - DHWH #1 and #2 Renewal | High |
| Domestic Water Distribution - Pipes and Fittings - 1968 Renewal | High |
| Exterior Doors - Doors & Hardware - 1998 Construction Renewal | High |
| Fencing & Gates - Chain Link Fence Renewal | High |
| Fencing & Gates - Concrete Stairs Renewal | High |
| Fin Tube Radiation Units - 1968 Renewal | High |
| Fittings - 1969 Construction - Millwork Renewal | High |
| Floor Finishes - Hardwood Flooring in the 1969 Single Gymnasium Renewal | High |
| G203003 Pedestrian Paving - Asphalt Paved Walkway Renewal | High |
| Heated Water Distribution Systems - Pipes and Fittings - 1968 Renewal | High |
| Interior Doors - Wood & Metal Renewal | High |
| Interior Doors - Hardware Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Parking Lots Renewal | High |
| Playing Fields - Soccer Field Renewal | High |
| Playing Fields - West of the school Renewal | High |
| Plumbing Fixtures - Washroom Renewal | High |
| Roadways Renewal | High |
| Roof Top AHU - Heat & Cool - RTU #1 Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Paint Renewal | High |
| Auxiliary Equipment - Heat Exchanger - Plate Renewal | Medium |
| B203004 Exterior Doors - Overhead and Roll - up Renewal | Medium |
| Ceiling Finishes - Acoustic Tile Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Medium |
| Distribution Systems - Air Distribution, Heating & Cooling - Duct System - 1991 and 1998 Renewal | Medium |
| Elevators and Lifts - Wheelchair Lift Renewal | Medium |
| Exhaust Systems - Centrifugal Renewal | Medium |
| Fin Tube Radiation Units - 1991 Renewal | Medium |
| Rain Water Drainage Renewal | Medium |
| Sanitary Waste Renewal | Medium |
| Interior Doors - 1995 & 1999 Construction - Hardware Renewal | Low |
| Plumbing Fixtures - Bradley Basins Renewal | Low |
| Plumbing Fixtures - Lavatories Renewal | Low |
| Plumbing Fixtures - Urinals Renewal | Low |
| Plumbing Fixtures - Water Closets Renewal | Low |