| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tank Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| Energy Supply System - Natural Gas Renewal | Urgent |
| Exterior Windows - Bay Renewal | Urgent |
| Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Gypsum Board Ceiling Renewal | High |
| Controls and Instrumentation - BAS Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Natural Gas DWH Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Electrical Service and Distribution - Panelboards Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Painted Hollow Metal Doors Renewal | High |
| Fencing & Gates - Perimeter Chain Link Fencing Renewal | High |
| Fin Tube Radiation Units - Forced Flow Heaters Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork - Cabinetry, Shelves and Counters Renewal | High |
| Floor Finishes - Hardwood - Gym [Wood Parquet] Renewal | High |
| Interior Doors - Aged Door Hardware Renewal | High |
| Interior Doors - Aged Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Main Switchboards - Secondary Switchgear Renewal | High |
| Other Special Systems and Devices - Dust Collector Renewal | High |
| Parking Lots - Asphalt Paved Parking Area Renewal | High |
| Partitions - Deteriorated Renewal | High |
| Pedestrian Paving - Asphalt and Concrete Paved Renewal | High |
| Playing Fields - Asphalt Paved Play Areas Renewal | High |
| Playing Fields - Baseball Diamond and Soccer Field - Unpaved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Rain Water Drainage Renewal | High |
| Sanitary Waste Renewal | High |
| Site Development - Exterior Stairs Renewal | High |
| Air Distribution, Heating & Cooling - Air Ducts Renewal | Medium |
| Ceiling Finishes - Suspended Acoustic Ceiling Tiles Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Medium |
| Domestic Water Distribution - Eyewash Stations Renewal | Medium |
| Emergency Lighting & Power - Natural Gas Generator Renewal | Medium |
| Heating Water Distribution Systems - Heating Piping Renewal | Medium |
| Interior Stair Construction - Steel Framed Stairs Renewal | Medium |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | Medium |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | Medium |
| Signage - Printed Wall Mounted Sign Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Stormwater Management Renewal | Medium |
| Wall Finishes - Painted - Classroom Walls Renewal | Medium |
| Fittings - Blinds and Shades Renewal | Low |
| Fittings - Chalkboards Renewal | Low |
| Landscaping - Site Landscaping Renewal | Low |
| Pedestrian Paving - Barrier Gate Renewal | Low |
| Plumbing Fixtures - Lavatories Renewal | Low |
| Plumbing Fixtures - Urinals Renewal | Low |
| Plumbing Fixtures - Water Closets Renewal | Low |
| Wall Finishes - Vinyl Wallcovering - Second Floor Renewal | Low |