| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
| A101004 Standard Foundations Repairs - Parging repairs - Localized Deficiencies Renewal | Urgent |
| Auxiliary Equipment - Expansion Tank Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | Urgent |
| Auxiliary Equipment - Humidifiers Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching - Boiler #3 Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching - Boilers #1 and #2 Renewal | Urgent |
| Cooling Generating Systems - AC #3, #4 and #5 Renewal | Urgent |
| Electrical Service and Distribution - Motor Control Centre Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Energy Supply System - Natural Gas Renewal | Urgent |
| Heated Water Distribution Systems - HTG Piping (1963 and 1971) - Level 1 Renewal | Urgent |
| Heated Water Distribution Systems - HTG Piping (1963 and 1971) - Level 2 Renewal | Urgent |
| Hot Water Boilers - Bolier #3 - DHW - Building Renewal | Urgent |
| Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Roof Coverings - Section F1,AB1 Renewal | Urgent |
| Secondary Transformer - Substation Renewal | Urgent |
| Air Handling Units - SF #2, #8, #9, #11, #12, #13 Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Ceiling Finishes - Specialty Roof Finishes Renewal | High |
| Ceiling Finishes - Suspended Ceiling Panels Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - Window AC Renewal | High |
| Domestic Water Distribution - DHW Storage Tank Renewal | High |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Domestic Water Distribution - Pool Sump Pumps Renewal | High |
| Exhaust Systems - Axial Renewal | High |
| Exhaust Systems - Centrifugal Renewal | High |
| Fencing & Gates - Chain Link Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Bleachers Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Construction Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Ceramic Tile Renewal | High |
| Floor Finishes - Gym Floor System Renewal | High |
| Floor Finishes - Terrazzo Renewal | High |
| G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
| Interior Doors - Hardware Renewal | High |
| Interior Doors Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | High |
| Other HVAC Systems and Equipment - Refrigeration Systems - Freezer/Cooler Renewal | High |
| Parking Lots - Asphalt Renewal | High |
| Partitions - Localized Damage Renewal | High |
| Pedestrian Paving Renewal | High |
| Playing Fields - Field Renewal | High |
| Playing Fields - Track Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Sanitary Waste Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Wall Finishes - Painting Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | Medium |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Medium |
| Controls and Instrumentation - BAS Renewal | Medium |
| Cooling Generating Systems - AC #1, #2 and #6 Renewal | Medium |
| Elevators and Lifts - Patient Transfer Lift Renewal | Medium |
| Heated Water Distribution Systems - HTG Piping (1978) Renewal | Medium |
| Interior Stair Construction Renewal | Medium |
| Landscaping Renewal | Medium |
| Stormwater Management Renewal | Medium |
| Other Special Systems and Devices - Dust Collector Renewal | Low |