| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tank Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | Urgent |
| Exterior Windows - Original Renewal | Urgent |
| Gas Supply System - Piping Renewal | Urgent |
| Hot Water Boilers - Boiler #1, #2 and #3 Renewal | Urgent |
| Hot Water Boilers - DHW Boiler Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct System Renewal | High |
| Air Handling Units - All Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Auxiliary Equipment - Stack & Breaching Renewal | High |
| Branch Wiring Renewal | High |
| C1010 Partitions Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) - New Renewal | High |
| C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
| C103010 Fittings - Millwork - Laboratories Renewal | High |
| C302001 Floor Finishes - Ceramic Renewal | High |
| C302003 Floor Finishes - Wood - Stage Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Controls & Instrumentation - BAS Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - Cooling Condenser - Office Renewal | High |
| Cooling Generating Systems - Window AC Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Domestic Water Distribution - DHW Storage Tank Renewal | High |
| Domestic Water Distribution - Eyewash Stations Renewal | High |
| Domestic Water Distribution - Plumbing Piping System Renewal | High |
| Electrical Service and Distribution - Secondary Transformers Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Hollow Metal Renewal | High |
| Exterior Walls - Joint Sealant Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing and Gates - Chain Link Fence Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Renewal | High |
| Floor Finishes - Sheet Vinyl Renewal | High |
| Main Switchboards - Main Disconnect & Main Distribution Panel Renewal | High |
| Perimeter Heating - Terminal Units Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Urinals Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Plumbing Fixtures - Water Coolers Renewal | High |
| Roof Coverings - Metal Roof Assembly System - Section B3,B4,BD1,BD2,BD3,BD4,CE1,CE2,CE3,DG1,DG2 Renewal | High |
| Wall Finishes - Painted - Drywall and Concrete Block Renewal | High |
| C102007 Interior Doors - Hardware Renewal | Medium |
| C103002 Fittings - Washroom Accessories Renewal | Medium |
| Domestic Water Distribution - DHW Tanks Renewal | Medium |
| Electrical Service and Distribution - Panel (600, 220, 120 V) Renewal | Medium |
| Emergency Lighting & Power - Generator Renewal | Medium |
| Fencing & Gates - Hollow Steel Control Gate Renewal | Medium |
| Floor Finishes - Gym 1,2,3 - Hardwood Renewal | Medium |
| Heating/Chilling Water Distribution Systems - Piping Renewal | Medium |
| Interior Doors - Wood & Metal Renewal | Medium |
| Playing Fields - Unpaved - Football Field Renewal | Medium |
| Playing Fields - Unpaved - Track Renewal | Medium |
| Signage - Wall Mounted & Freestanding Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Fittings - Lockers Not Built - In Renewal | Low |
| Fittings - Lockers Renewal | Low |
| Fittings - Window Coverings - Drapes Renewal | Low |
| Landscaping Renewal | Low |
| Pedestrian Paving - Asphalt Renewal | Low |
| Pedestrian Paving - Concrete Renewal | Low |