| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tank Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Floor Finishes - Carpet - Library Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Air Handling Units - SF #1 Thru #8 Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Auxiliary Equipment - Stacks & Breaching Renewal | High |
| B201011 Exterior Walls - Joint Sealant Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103009 Fittings - Millwork - Laboratories Renewal | High |
| C302004 Floor Finishes - Vinyl Tile Renewal | High |
| Chilled Water Systems - Air-Cooled Chiller #2 Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Distribution Systems - Exhaust Systems - Axial Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Metal Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Lockers Renewal | High |
| Fittings - Millwork Renewal | High |
| G204002 Retaining Walls - Rail Ties Renewal | High |
| Heated Water Distribution Systems - Pipes and Fittings Renewal | High |
| Hot Water Boilers - Boilers #1 and #2 Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Make - Up AHU - MUA #1 Renewal | High |
| Parking Lots - Original Building Renewal | High |
| Partitions - Localized Deficiencies Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Plumbing Fixtures - Water Closets Renewal | High |
| Roadways - Original Building Renewal | High |
| Roof Coverings - Section A,A3,A4,B,B1,C Renewal | High |
| Sanitary Waste Renewal | High |
| Signage Renewal | High |
| Air Distribution, Heating & Cooling - Duct Work Renewal | Medium |
| Ceiling Finishes - Suspended Acoustic Panel Tile Renewal | Medium |
| Emergency Lighting & Power - Inverter Renewal | Medium |
| Energy Supply System - Natural Gas Renewal | Medium |
| Exterior Walls - Control Joints Renewal | Medium |
| Fencing & Gates - Original Building Renewal | Medium |
| Interior Doors - Wood Renewal | Medium |
| Interior Doors - Hardware Renewal | Medium |
| Interior Stair Construction Renewal | Medium |
| Other Special Systems and Devices - Dust Collector Renewal | Medium |
| Pedestrian Paving Renewal | Medium |
| Rain Water Drainage Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Stormwater Management Renewal | Medium |
| Wall Finishes - Ceramic Tile Renewal | Medium |
| Wall Finishes - Painted - Common Areas Renewal | Medium |
| Wall Finishes - Painted - Gymnasium Renewal | Low |