| Brief Description | Priority |
| A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Auxiliary Equipment - Expansion Tank Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps - 1998 Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| B2020 Exterior Windows - Older Renewal | Urgent |
| Domestic Water Distribution - DHWH #1 and #2 Renewal | Urgent |
| Electrical Service and Distribution - Panelboards Renewal | Urgent |
| Energy Supply System - Natural Gas Renewal | Urgent |
| Heated Water Distribution System - Piping Systems Renewal | Urgent |
| Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
| Air Handling Units - AHU #2 Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| B201017 Exterior Walls - 1998 Stucco Renewal | High |
| B2030 Exterior Doors - Hollow Metal - Older Renewal | High |
| B203008 Exterior Doors - Hardware - Older Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | High |
| C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
| C1020 Interior Doors - Hollow Metal / Wood Single Door - Older Renewal | High |
| C102007 Interior Doors - Hardware - Older Renewal | High |
| C1030 - Fittings - Washroom - Older Renewal | High |
| C103009 Fittings - Millwork - Classrooms - Older Renewal | High |
| C301005 Wall Finishes - Paint - Older Renewal | High |
| C302003 Floor Finishes - Wood - Older Renewal | High |
| C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
| C302005 Floor Finishes - Carpet Renewal | High |
| C303004 Ceiling Finishes - Acoustic - Older Renewal | High |
| Controls and Instrumentation - Pneumatic Renewal | High |
| Cooling Generating Systems - Window AC Units Renewal | High |
| Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Elevators and Lifts - WCA Lift Renewal | High |
| Fencing & Gates - Chain link fencing Renewal | High |
| Fencing & Gates - Skyway Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Landscaping - Soft Renewal | High |
| Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
| Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
| Parking Lots - Asphalt paved Renewal | High |
| Pedestrian Paving - Concrete walkways Renewal | High |
| Playing Fields - Aphalt paved Renewal | High |
| Plumbing Fixtures - Washroom Renewal | High |
| Roadways - Asphalt paved Renewal | High |
| Roof Coverings - Section A1 Renewal | High |
| Sanitary Waste Renewal | High |
| Terminal and Package Units - Unit Ventilators Renewal | High |
| Auxiliary Equipment - Expansion Tanks - 1998 Renewal | Medium |
| Chilled Water Systems - Chiller Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Medium |
| Exterior Doors - 1998 Construction Renewal | Medium |
| Playing Fields - Sodded sports field Renewal | Medium |
| Roof Coverings - Section A,C1 Renewal | Medium |
| Signage Renewal | Medium |
| Site Civil/Mechanical Utilities Renewal | Medium |
| Domestic Water Distribution - Drinking Fountains and Coolers Renewal | Low |
| Exterior Doors - 1998 Construction - Hardware Renewal | Low |
| Plumbing Fixtures - Lavatories Renewal | Low |
| Plumbing Fixtures - Water Closets Renewal | Low |