| Brief Description | Priority |
| Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
| Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
| Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
| Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
| Gas Supply System - Piping Renewal | Urgent |
| Hot Water Boilers - Boiler #1 & #2 Renewal | Urgent |
| Main Switchboards - Switchgear Renewal | Urgent |
| Secondary - Transformers Renewal | Urgent |
| Site Civil/Mechanical Utilities - 1959 Construction Renewal | Urgent |
| Standard Foundations Repairs - Parging repairs Renewal | Urgent |
| Air Distribution, Heating & Cooling - Duct System Renewal | High |
| Air Handling Units - Central Station AHUs Renewal | High |
| Auxiliary Equipment - Chemical Feed System Renewal | High |
| Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
| C1010 Partitions - Localized Deficiencies Renewal | High |
| C1030 - Fittings - Washroom Renewal | High |
| C103013 Fittings - Retractable Stage Renewal | High |
| C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
| Ceiling Finishes - Acoustic Tile Ceilings Renewal | High |
| Cooling Generating Systems - DX Split - Cool - Library Renewal | High |
| Domestic Water Distribution - DHW Circulation Pumps Renewal | High |
| Domestic Water Distribution - DHWH #1 Renewal | High |
| Domestic Water Distribution - DHWH #2 Renewal | High |
| Domestic Water Distribution - Pipes and Fittings Renewal | High |
| Exhaust Systems Renewal | High |
| Exhaust Systems Renewal | High |
| Exterior Doors - Hardware Renewal | High |
| Exterior Doors - Hollow Metal Doors Renewal | High |
| Exterior Walls - Deteriorated Brick Renewal | High |
| Exterior Walls - Joint Sealant Renewal | High |
| Exterior Walls - Masonry Re-pointing Renewal | High |
| Fencing & Gates - Original Fencing Renewal | High |
| Fin Tube Radiation Units - Perimeter Heating Renewal | High |
| Fittings - Millwork Renewal | High |
| Floor Finishes - Carpet Flooring Renewal | High |
| Floor Finishes - Hardwood Flooring Renewal | High |
| Floor Finishes - Painted Concrete Flooring Renewal | High |
| Interior Doors - Hardware Renewal | High |
| Interior Doors - Wood & Hollow Metal Doors Renewal | High |
| Lighting Equipment - Exterior - Wall Mounted Renewal | High |
| Pedestrian Paving - Concrete & Asphalt Renewal | High |
| Playing Fields - Unpaved Renewal | High |
| Playing Fields - West & South Playgrounds - Paved Renewal | High |
| Plumbing Fixtures - Bradley Basins Renewal | High |
| Plumbing Fixtures - Lavatories Renewal | High |
| Roadways - North & South Driveways Renewal | High |
| Sanitary Waste - Piping Renewal | High |
| Signage - Wall Mounted Renewal | High |
| Stormwater Management Renewal | High |
| Wall Finishes - Paint Renewal | High |
| Floor Finishes - Vinyl Tile - Upgraded Renewal | Medium |
| Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | Medium |
| Roof Coverings - Section B2E Renewal | Medium |
| Controls & Instrumentation - EMS Renewal | Low |
| Interior Stair Construction - Steel & Terrazzo Renewal | Low |
| Landscaping - 1959 Construction Renewal | Low |
| Pedestrian Paving - Gates Renewal | Low |
| Playing Fields - Belair Childcare Playscape - Unpaved Renewal | Low |
| Wall Finishes - Wood Paneling Renewal | Low |