Toronto District School Board
Skip to main content

Oriole Park Junior Public School (GR. JK-05)

Health and Safety (H&S) workplace inspections are conducted every month in all of our 582 operating schools. Below you can find the H&S reports for your school, for the 2021-2022 school years.  More information and Frequently Asked Questions

Date InspectedLocation in SchoolHealth & Safety Issue ObservedClassAction Taken ByDate Action TakenDetails
09/10/21mech rm 1st floorlighting in need of repair (maintenance issue)ACaretaker09/13/21Details
09/10/21Hallwaytrip hazard (i.e. flooring, other materials)ACaretaker09/13/21Details
10/19/217trip hazard (i.e. flooring, other materials)ACaretaker10/29/21Details
10/19/21Boiler Room Basementpaint flaking, chipping, possible lead exposureACaretaker10/29/21Details
11/05/21Boiler Rmleaking/pooling/ponding of water or liquid (be as specific as possible)ACaretaker11/05/21Details
12/29/21room 4display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal01/01/22Details
12/29/21room 2ceiling damaged (specify)ACaretaker12/29/21Details
12/29/21Staff RoomHealth & Safety bulletin board - required items are missing or outdated (be specific)BPrincipal01/01/22Details
12/29/21room 2damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker12/29/21Details
12/29/21rooms 2 & 3insulation - required or in need of repairACaretaker12/29/21Details
12/29/21boiler roomunable to inspect (specify why if possible)BCaretaker12/29/21Details
01/27/22staff washroomlighting in need of repair (maintenance issue)ACaretaker01/27/22Details
02/18/22Boiler Rmpaint flaking, chipping, possible lead exposureACaretaker05/04/22Details
02/18/22meter room basementinappropriate storage of materials/furniture/shelving, or clutterBPrincipal03/04/22Details
02/18/22meter room basementeyewash station required or in need of repair (specify)ACaretaker05/04/22Details
02/18/22Gym kitchenceiling damaged (specify)ACaretaker06/15/22Details
03/01/229receptacle/light switch (specify)ACaretaker03/04/22Details
03/01/2211leaking/pooling of liquid/water on equipment (be as specific as possible)ACaretaker05/24/22Details
03/01/2211damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker06/06/22Details
03/01/2211window covering damaged/in need of repairACaretaker06/30/22Details
03/01/2211air - return/supply (specify)ACaretaker06/06/22Details
03/01/2211window covering damaged/in need of repairACaretaker06/30/22Details
04/25/22Staff RoomWorkplace Inspection Report posted?BCaretaker05/13/22Details
04/25/22Staff RoomJoint Health & Safety Committee meeting minutes - latest copy not postedBPrincipal05/02/22Details
04/25/22mech rm 1st floorinappropriate storage of materials/furniture/shelving, or clutterBCaretaker05/24/22Details
05/30/22boiler roomACM - yellow asbestos bags present (incl. number of bags)A1Caretaker06/06/22Details