Toronto District School Board

Facility Condition Index

The Facility Condition Index (FCI) rating does not reflect the safety of a school building. Rather, it is a measurement of the condition of that school. Therefore, an older school may have more needed repairs and therefore a higher FCI rating, but not one of those many repairs is a health or safety issue. At the Toronto District School Board, the average age of our schools is over 60 years and building components such as walls, lights, floors, ventilation systems, etc. continue to age requiring major repairs or replacement.

Our Facilities staff works all year round to ensure our schools are safe regardless of their FCI rating. The health and safety of students, staff and community members who use our schools are considered the highest priority in planning school repairs. Effort is made to repair building components where possible; where a component is beyond repair, it will be scheduled for replacement.

William Lyon Mackenzie Collegiate Institute (GR. 09-12)

F.C.I.
48.40 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.


The Toronto District School Board is investing millions of dollars to improve the conditions of its schools. Learn More about our School Repairs Investment Profile (Provincial Government Funding) and our Current School Repairs Projects/Highlights.

Renewal Needs Backlog

The Toronto District School Board’s (TDSB’s) Renewal Needs Backlog lists 23,232 different repairs that have been identified in our 588 schools. The total value of those repairs is approximately $3.4 billion.

It is because the TDSB did not receive adequate provincial funding to make the needed repairs that the backlog continued to grow. However, we have received additional provincial funding allowing us to invest $579 million in school repairs from September 2015 to August 2017. This will allow us to begin to reduce our Renewal Needs Backlog.

It is very important to understand that not one of these repairs represents a health or safety concern for our students and staff. In fact, it is because the safety of our schools is a top priority for us at TDSB that our maintenance plans are always focused on providing safe places for our students to learn. In that regard, we schedule maintenance to fix the most critical problems related to the health and safety of our students and staff.

Also, while components in a school building may be past their life expectancy, i.e. a water boiler, they are in good repair and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life and these systems are very important to the operation of the building such as (Boilers, Other Heat Generating Systems, Fire Alarm, Sprinkler System, Standpipe System, Public Address System, Roofing, etc.). There is no specific timeframe to repair/replace this system; however, repair/replacement is highly recommended as soon as funding is available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those assigned an urgent priority such as (Brick Work, Exterior Doors, Exterior Windows, Rooftop Units, etc.). There is no specific timeframe to repair/replace this system; however, repair/replacement is recommended as soon as funding is available.
Medium Building systems that are in fair condition with low importance to the operation of the building such as (Floor Finishes, Washroom Partitions, Millwork, etc.)
Low Building systems that are in fair or good condition with very low importance to the operation of the building such as (Wall Partitions, Interior Wall Finishes, Interior Doors, Fences, etc.).

Air Handling Units - Original Building RenewalUrgent
Auxiliary Equipment - HVAC pumps RenewalUrgent
Auxiliary Equipment - Cushion Tanks RenewalUrgent
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Domestic Water Distribution RenewalUrgent
Exterior Doors & Hardware RenewalUrgent
Exterior Walls - Localized Deficiencies RenewalUrgent
Exterior Windows RenewalUrgent
Fittings - Bleachers RenewalUrgent
Fittings - Lockers RenewalUrgent
Fittings - Metal Partition RenewalUrgent
Fittings - Millwork RenewalUrgent
Floor Finishes - Ceramic Tile RenewalUrgent
Floor Finishes - Vinyl tiles RenewalUrgent
Hot Water Boilers - Boiler #1 RenewalUrgent
Hot Water Boilers - Boiler #2 RenewalUrgent
Lighting Equipment - Exterior RenewalUrgent
Lighting Equipment RenewalUrgent
Main Switchboards - Main Disconnect RenewalUrgent
Public Address Systems - PA System RenewalUrgent
Roof Coverings - Section D,D2 RenewalUrgent
Roof Coverings - Skylights RenewalUrgent
Standard Foundations - Localized Deficiencies RenewalUrgent
Study [Domestic Water Distribution]Urgent
Terminal & Package Units - Radiators & Force Flow Heaters RenewalUrgent
Branch Wiring RenewalHigh
Ceiling Finishes - Acoustic Tiles RenewalHigh
Exhaust Systems - -Exhausters RenewalHigh
Interior Doors & Hardware RenewalHigh
Parking Lots RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Roadways RenewalHigh
Study [Branch Wiring]High

© 2014 Toronto District School Board  |  Terms of Use  |  CASL