Toronto District School Board
Toronto District School Board
Icon - Find Your School  Find Your School|Newcomers|Policies|Media
About Us|Staff|Innovation|Leadership|Contact Us
Translate
Close Window X

Google Translate Limitations Disclaimer

The electronic translation service on the Toronto District School Board website is hosted by Google Translate, a third party service. The TDSB does not guarantee or warrant the reliability, accuracy or completeness of any translated information.

The quality of the translation will vary in some of the languages offered by Google. Google Translate is a free service and currently offers translation in over 100 languages, but does not capture all languages or dialects.

The basic translation goal is to capture the general intention of the original English material. Before you act on translated information, we encourage you to confirm any facts that are important to you or may affect any decisions you make.

The Toronto District School Board is committed to equity and community engagement, and by providing this tool, we are making our information more accessible to families whose first language is not English.

Google Translate Frequently Asked Questions

TDSB Search  Search

Jarvis Collegiate Institute

Facility Condition Index

September 1, 2017 to August 31, 2018

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the school building. 

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of the 584 TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.

F.C.I.
94.01 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies 22,686 different repairs needed in our 584 schools. The total value of those repairs is approximately $3.7 billion as of September 2017. 

For the 2017-2018 school year, the TDSB received $297 million in provincial funding. From this amount, $50 million should be used to replace energy efficient building components. The remaining $247 million should be used to replace/repair building components identified during the schools inspection, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).

A101004 Standard Foundations Repairs - Damp proofing Repairs - Original Building RenewalUrgent
Auxiliary Equipment - Vacuum Return Tank RenewalUrgent
Auxiliary Equipment - Vacuum Return and Condensate Pumps RenewalUrgent
B302006 Roof Openings - Skylight - Art Room RenewalUrgent
B302006 Roof Openings - Skylight - Greenhouse RenewalUrgent
Fire Protection Specialties - Fire Pump RenewalUrgent
Heating Water Distribution Systems - Heating Piping RenewalUrgent
Interior Stair Construction - Metal framed stairs RenewalUrgent
Main Switchboards - Main Switchgear RenewalUrgent
Public Address Systems - Auditorium RenewalUrgent
Roof Coverings - Section A,B,C,D,E,E1,I1,I2,J1,L,L1,L2,L3,M,N RenewalUrgent
Roof Coverings - Section B1 RenewalUrgent
Secondary - Secondary Transformers RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Standpipe Systems RenewalUrgent
Air Distribution - Duct System RenewalHigh
Air Handling Units - Central RenewalHigh
B101001 Structural Frame - Localized Deficiencies RenewalHigh
B201014 Exterior Walls - Masonry Re-pointing RenewalHigh
B202005 Exterior Windows - Sealant Replacement - RenewalHigh
B203008 Exterior Doors - Hardware RenewalHigh
Branch Wiring RenewalHigh
C102007 Interior Doors - Hardware RenewalHigh
C103001 Fittings - Washroom Partitions - Water Closet RenewalHigh
C103002 Fittings - Washroom Accessories RenewalHigh
C103005 Fittings - Lockers RenewalHigh
C103010 Fittings - Millwork - Laboratories RenewalHigh
C103017 Fittings - Auditorium Seating RenewalHigh
Ceiling Finishes - Lathe and Plaster Finishes RenewalHigh
Ceiling Finishes - Suspended Ceiling Tiles RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Distribution Systems - Exhaust Systems - Centrifugal RenewalHigh
Domestic Water Distribution - Domestic Hot Water Storage Tank RenewalHigh
Domestic Water Distribution - Plumbing Piping RenewalHigh
Exterior Doors - 1924 Construction - Hollow Metal and Wood RenewalHigh
Exterior Doors - 1971 Construction - Hollow Metal Doors RenewalHigh
Exterior Windows - Entire Building RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Hardwood Floors RenewalHigh
Floor Finishes - Sheet Vinyl Flooring RenewalHigh
Floor Finishes - Vinyl Floor Tiles RenewalHigh
G202003 Parking Lots - Paved - Asphalt RenewalHigh
G204001 Fencing and Gates - Chain Link Fence RenewalHigh
G204001 Fencing and Gates - Wrought Iron Fencing RenewalHigh
G204002 Retaining Walls - Precast Concrete RenewalHigh
G204071 Playing Fields - Unpaved RenewalHigh
G204072 Playing Fields - Asphalt Running Track RenewalHigh
Interior Doors - Classroom Doors - Wood and Hollow Metal RenewalHigh
Lighting and Branch Wiring - Interior Lighting - Parking Garage RenewalHigh
Perimeter Heating - Terminal Units RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Plumbing Fixtures - Water Coolers RenewalHigh
Retaining Walls - Stone RenewalHigh
Stormwater Management - Site RenewalHigh
Study Cracked MasonryHigh
Wall Finishes - Painted RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalMedium