Toronto District School Board

Winona Drive Senior Public School

Facility Condition Index

September 1, 2017 to August 31, 2018

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the school building. 

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of the 584 TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.

F.C.I.
118.17 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies 22,686 different repairs needed in our 584 schools. The total value of those repairs is approximately $3.7 billion as of September 2017. 

For the 2017-2018 school year, the TDSB received $297 million in provincial funding. From this amount, $50 million should be used to replace energy efficient building components. The remaining $247 million should be used to replace/repair building components identified during the schools inspection, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).

Air Handling Units - Aged Exhaust Fan RenewalUrgent
Air Handling Units - Supply Fans RenewalUrgent
Auxiliary Equipment - Chimney and exterior stack RenewalUrgent
Auxiliary Equipment - Circulation Pumps RenewalUrgent
Domestic Water Distribution - All RenewalUrgent
Domestic Water Distribution - Tank RenewalUrgent
Elevators & Lifts RenewalUrgent
Energy Supply RenewalUrgent
Exterior Doors & Hardware RenewalUrgent
Fencing & Gates - Exterior Concrete Stairs RenewalUrgent
Fencing & Gates - Fence RenewalUrgent
Fittings - Lockers RenewalUrgent
Fittings - Millwork RenewalUrgent
Floor Finishes - Ceramic Tile RenewalUrgent
Floor Finishes - Sheet Vinyl RenewalUrgent
Floor Finishes - Terrazzo RenewalUrgent
Floor Finishes - Vinyl Tile RenewalUrgent
Heating/Chilling water distribution systems RenewalUrgent
Hot Water Boilers - Boiler #1 RenewalUrgent
Hot Water Boilers - Boiler #2 RenewalUrgent
Hot Water Boilers - Boiler #3 RenewalUrgent
Hot Water Boilers - Boiler #4 RenewalUrgent
Interior Stair Construction RenewalUrgent
Lighting Equipment - Emergency RenewalUrgent
Lighting Equipment - Exterior RenewalUrgent
Lighting Equipment - Pool RenewalUrgent
Major Repair [Exterior Walls - Localized Deficiencies ]Urgent
Major Repair [Standard Foundations - Localized Deficiencies]Urgent
Playing Fields - Unpaved RenewalUrgent
Replace [Exterior Windows - Original Remaining]Urgent
Replace [Retaining Walls]Urgent
Roof Coverings - Section B,C,D RenewalUrgent
Site Civil/Mechanical Utilities - Sanitary Lines RenewalUrgent
Site Development - Signage RenewalUrgent
Study [Domestic Water Distribution - All]Urgent
Study [Heating/Chilling water distribution systems]Urgent
Study [Standard Foundations - Localized Deficiencies]Urgent
Branch Wiring RenewalHigh
Ceiling Finishes - Acoustic Ceiling Tile RenewalHigh
Ceiling Finishes - Paint RenewalHigh
Interior Doors & Hardware RenewalHigh
Parking Lots - Original Building RenewalHigh
Playing Fields - Paved RenewalHigh
Plumbing Fixtures RenewalHigh
Stormwater Management - Original Building RenewalHigh
Study [Branch Wiring]High
Wall Finishes - Paint RenewalHigh
Floor Finishes - Hardwood RenewalMedium
Major Repair [Partitions - Localized Deficiencies]Medium
Partitions - Washroom Partitions RenewalMedium
Parking Lots - Curbs RenewalLow
Roadways - Original Building RenewalLow